Page 12
WEIGH HOPPERS & SURGE HOPPERS
B
C
AIR GATE AND VIBRATOR
CONTROLLER INSTALLATION
ON SHORT HOPPERS
1.
Clamp the controller bracket to
the desired leg of the hopper.
2.
Install air valve for the air gate
on the panel .
3.
Connect air lines from the air
valve to the cylinder on the air
gate and secure air lines with
zip ties. Connect to valve
points “B” and C”.
1
3
5
4
2
Item #
Part #
Rev
Title
Material
Qty
Length
Width
1
06-01-0189
A
BOLT FLG .375-16 X 1.250 ZP GR5
06-01-0189 13103 FASTENAL
4
2
06-03-0014
A
NUT LOCK FLG .375-16 ZP GR5
06-03-0014 1137341 FASTENAL
4
3
103794
A
AIR CNTRL ARM MNT 80U VIB
11-03-0004 SHEET, 12GA CS
1
4
103795
A
AIR CNTRL ARM MNT 80U VIB
11-03-0008 PLATE 3/16" CS
1
10.124
5.000
5
103796
A
SPACER
11-03-0010 plate .25 cs
1
1
3
5
4
2
Item #
Part #
Rev
Title
Material
Qty
Length
Width
1
06-01-0189
A
BOLT FLG .375-16 X 1.250 ZP GR5
06-01-0189 13103 FASTENAL
4
2
06-03-0014
A
NUT LOCK FLG .375-16 ZP GR5
06-03-0014 1137341 FASTENAL
4
3
103794
A
AIR CNTRL ARM MNT 80U VIB
11-03-0004 SHEET, 12GA CS
1
4
103795
A
AIR CNTRL ARM MNT 80U VIB
11-03-0008 PLATE 3/16" CS
1
10.124
5.000
5
103796
A
SPACER
11-03-0010 plate .25 cs
1
4.
Supply air to port “A” at
approximately 80
-
120 psi. A
dryer is recommended in
line.
5.
If hopper is supplied with
vibrator, mount the switch
to the controller bracket
6.
Have a licensed electrician
run 120v to the switch.
2
1
3
5
4
2
Item #
Part #
Rev
Title
Material
Qty
Length
Width
1
06-01-0189
A
BOLT FLG .375-16 X 1.250 ZP GR5
06-01-0189 13103 FASTENAL
4
2
06-03-0014
A
NUT LOCK FLG .375-16 ZP GR5
06-03-0014 1137341 FASTENAL
4
3
103794
A
AIR CNTRL ARM MNT 80U VIB
11-03-0004 SHEET, 12GA CS
1
4
103795
A
AIR CNTRL ARM MNT 80U VIB
11-03-0008 PLATE 3/16" CS
1
10.124
5.000
5
103796
A
SPACER
11-03-0010 plate .25 cs
1
5
A
C
B
05-05-0767 WITH ADDED HOPPER