11/2015
NT BEA-G6EVO
V3.0
EN
p. 30/58
4.2. OPERATING TEST - COMMISSIONING OF THE SYSTEM
The operating tests to perform depend on the global solution and allocated controller chosen. Therefore please refer to the
used controller before commissioning the sytem.
4.3. REMOVING SITE PROTECTIONS
After performing all operating tests with success and making the access point functional and safe, the protections and
signs can be removed.