Page 3-1
SL20
Se
ct
ion
3
M
AINTENANCE
3.1 I
NTRODUCTION
Reference: •
Section 2 for recommended maintenance intervals.
W A R N I N G
!
Be sure to read, understand and follow all information in the Operation Section of this
manual before attempting to operate or perform service on any Work Platform.
This section contains instructions for the maintenance of the Work Platform. Procedures for the
operation inspection, adjustment, scheduled maintenance, and repair/removal are included.
Referring to Section 2 will aid in understanding the operation and function of the various compo-
nents and systems of the work platform, and help in diagnosing and repair of the machine.
T
ERMINOLOGY
T
ER MINA L
B
LOCKS
Located in upper and lower control boxes. Designated by TB##. (##) designates the number of the
block which is written on the terminal block. “R” right or “L” may follow the number.
W
IRE
C
OLOR
Indicated by color/color. First color refers to insulation color and second color indicates stripe. If sec-
ond color is not given there is no stripe.
G
ENERAL
P
ROCEDURES
C
ONTAC T
B
LOCKS
Removed by inserting a flat screwdriver into the slot at either end of block and prying outward.
Installed by pressing into an empty slot.
S
WITCH
M
OU NT
B
A SE
Assembled to back of switch actuator. Removed by rotating the small black lever counterclockwise
and lifting off base.
T
ER MINA L
B
LOCKS
Remove wires by inserting a small flat bladed screwdriver into square beside wire. Install wires by
stripping ½” of insulation, inserting screwdriver in square and inserting wire. Be sure no strands are
bend backwards. Replace wires with same rating and type.
3.2 D
ATE
C
ODE
I
DENTIFICATION ON
H
OSES
G
ATES
uses a five digit code:
Year, Month, Day
.
i.e.: 6 11 29 - means 1996, month 11 (November), day 29.
P
ARKER
uses a ten digit code:
Plant, Year, Month, Day.
i.e.: XXXX 6 11 29 - means Plant XXXX, 1996, month 11 (November), day 29.
D
A YCO
stamps month, day and year on each hose.
Summary of Contents for SL20 Series
Page 1: ......
Page 10: ...Page viii Table of Contents List of Tables SL20 Work Platform NOTES ...
Page 12: ...Page 1 2 Introduction 1 2 General Description SL20 NOTES ...
Page 33: ...Page 3 11 Maintenance 3 11 Setting Hydraulic Pressures SL20 NOTES ...
Page 61: ...Page 5 7 Schematics Hydraulic Schematic SL20 Figure 5 2 Plugs 4 ...
Page 62: ...Page 5 8 Schematics SL20 NOTES ...
Page 65: ...Page 6 3 Illustrated Parts Breakdown Final Assembly SL20 Drawing 2 of 3 ...
Page 66: ...Page 6 4 Illustrated Parts Breakdown Final Assembly SL20 Drawing 3 of 3 ...
Page 69: ...Page 6 7 Illustrated Parts Breakdown Chassis Assembly SL20 Drawing 1 of 2 ...
Page 70: ...Page 6 8 Illustrated Parts Breakdown Chassis Assembly SL20 Drawing 2 of 2 ...
Page 73: ...Page 6 11 Illustrated Parts Breakdown Linkage Assembly SL20 ...
Page 75: ...Page 6 13 Illustrated Parts Breakdown Control Module Assembly SL20 ...
Page 79: ...Page 6 17 Illustrated Parts Breakdown Control Valve Assembly SL20 ...
Page 91: ...Page 6 29 Illustrated Parts Breakdown Label Kit Installation SL20 ...
Page 93: ...Page 6 31 Illustrated Parts Breakdown Label Kit German SL20 ...
Page 95: ...Page 6 33 Illustrated Parts Breakdown Label Kit French SL20 ...
Page 97: ...Page 6 35 Illustrated Parts Breakdown Label Kit Spanish SL20 ...
Page 102: ...Page 6 40 Illustrated Parts Breakdown SL20 NOTES ...
Page 103: ......