Page 2-6
Operation
- 2.6 - Maintenance
SL20
B
Y
T
RUCK
1. Lift platform above eight feet, then lower using the control handle. The platform will stop at
the Loading Clearance Height.
2. Maneuver the work platform into transport position. Press the Loading Clearance Height
Release Switch to fully lower the platform, then chock the wheels.
3. Secure the work platform to the transport vehicle with chains or straps of adequate load
capacity attached to the chassis tie down/lifting lugs.
C A U T I O N
!
Overtightening of chains or straps through tie down lugs may result in damage to work
platform.
2.6 M
AINTENANCE
D A N G E R
!
Never perform service on the work platform in the elevating assembly area while
platform is elevated without first blocking the elevating assembly.
DO NOT stand in elevating assembly area while deploying or storing brace.
DO NOT block elevating assembly with a load in the platform.
B
LOCKING
E
LEVATING
A
SSEMBLY
B
RACE
I
NSTALLATION
Figure 2-6:
Blocking the Elevating Assembly
1. Park the work platform on firm, level ground.
2. Turn and hold Chassis Key Switch to Chassis.
Push chassis lift switch to LIFT and elevate
platform approximately two feet.
3. Place 10 cm. x 10 cm. (4 in. x 4 in.) wood block
as shown in illustration.
4. Turn and hold Chassis Key Switch to Chassis.
Push chassis lift switch to LOWER and gradu-
ally lower platform until boom is supported by
the wood block.
B
RACE
R
EMOVAL
1. Turn and hold Chassis Key Switch to Chassis.
Push chassis lift switch to LIFT and gradually
raise platform until wood block can be removed.
2. Remove wood block.
3. Turn and hold Chassis Key Switch to Chassis. Push chassis lift switch to LOWER and com-
pletely lower platform.
4. Close control module cover.
1. Wood Block
Summary of Contents for SL20 Series
Page 1: ......
Page 10: ...Page viii Table of Contents List of Tables SL20 Work Platform NOTES ...
Page 12: ...Page 1 2 Introduction 1 2 General Description SL20 NOTES ...
Page 33: ...Page 3 11 Maintenance 3 11 Setting Hydraulic Pressures SL20 NOTES ...
Page 61: ...Page 5 7 Schematics Hydraulic Schematic SL20 Figure 5 2 Plugs 4 ...
Page 62: ...Page 5 8 Schematics SL20 NOTES ...
Page 65: ...Page 6 3 Illustrated Parts Breakdown Final Assembly SL20 Drawing 2 of 3 ...
Page 66: ...Page 6 4 Illustrated Parts Breakdown Final Assembly SL20 Drawing 3 of 3 ...
Page 69: ...Page 6 7 Illustrated Parts Breakdown Chassis Assembly SL20 Drawing 1 of 2 ...
Page 70: ...Page 6 8 Illustrated Parts Breakdown Chassis Assembly SL20 Drawing 2 of 2 ...
Page 73: ...Page 6 11 Illustrated Parts Breakdown Linkage Assembly SL20 ...
Page 75: ...Page 6 13 Illustrated Parts Breakdown Control Module Assembly SL20 ...
Page 79: ...Page 6 17 Illustrated Parts Breakdown Control Valve Assembly SL20 ...
Page 91: ...Page 6 29 Illustrated Parts Breakdown Label Kit Installation SL20 ...
Page 93: ...Page 6 31 Illustrated Parts Breakdown Label Kit German SL20 ...
Page 95: ...Page 6 33 Illustrated Parts Breakdown Label Kit French SL20 ...
Page 97: ...Page 6 35 Illustrated Parts Breakdown Label Kit Spanish SL20 ...
Page 102: ...Page 6 40 Illustrated Parts Breakdown SL20 NOTES ...
Page 103: ......