4.3 Operation settings

The operation settings and alarm 
acknowledgements are carried out 
in the soft ware menu.  

The menu is opened by pressing 
the Enter key (

 ) at any stage in 

the soft ware. The arrow keys 
(

 and 

) are used to navigate 

in the menu. The desired operation 
setting may also be selected using 
the shortcut number key. The table 
below presents the shortcut keys.

The desired setting is selected 
using the Enter key. The setting is 
changed by pressing the arrow keys 
and accepted using the Enter key. 
The number key 9 exits the menu. 

OPERATION SETTING MENUS: 

Change the setting with the arrow keys ( 

 and 

) and accept by pressing Enter  

 

). The number key 9 exits the menu.

 Menu 

Fin -> Swe/Eng      0

Fin -> Swe / Eng

 

 Suomi 

Language selection

Move to language selection by pressing Enter. Change language by pressing the arrow keys 
and accept by pressing Enter.

 Menu 

Sludge bag               1

Sludge bag

 Yes  

Sludge emptying method selection

In the treatment plant, sludge is removed by default using a sludge bag.
If you want to remove sludge using a vacuum truck, move to the selection by pressing Enter, 
change the default setting with the arrow buttons (No) and confi rm the selection by pressing 
Enter. 
The sludge pump does not transfer sludge into the sludge bag. The sludge removal reminder 
is given automatically aft er 6 months. 
The sludge counter resets when you acknowledge the reminder.
If you remove sludge using a vacuum truck before the sludge removal reminder, reset the 

sludge counter by pressing the 



button.

 Menu 

Sludge alarm            2

Sludge bag alarm

  No  

Sludge bag replacement reminder every 3 months (not on by default).
The function is activated by choosing Yes and pressing Enter.
If you change the sludge bag before the sludge removal reminder, reset the sludge counter 

by pressing the 



button.

 Menu 

Process block           3

Process block 

 16.00  

 No 

Specifying sampling time

The function is activated by choosing Yes and pressing Enter. Feed the process block end 
time in numbers and press Enter. The time is specifi ed by being 7 h 30 min before the samp-
ling time. Sampling will not succeed, however, if the process has not started due to low load. 

 Menu 

Alarms                     4

Reset

  No  

Alarm acknowledgement

If there are several alarms, you can use the

key to browse the alarm screens.

 Menu 

Night alarm             5

Night alarm

  No  

Sending alarm messages (GSM modem) between 22.00 and 07.00. When night alarm is not 
in use, the alarm SMS will be sent at 07.01 (not on by default) 

 Menu 

Time settings          6

Time setting
11.01. 16.06

Date and time 

Input the correct time with the number keys. The number is input in sequences of four digits. 
Pressing Enter moves to the next sequence. 

 Menu 

Alarm GSM number

                                7

Alarm GSM number 

+35840123456

The mobile phone number where the alarm message 
(GSM modem) is sent 

Enter the number starting with the country code (F358) and leave out the fi rst 0 
in the GSM number. Aft er each sequence of four numbers, press Enter. If the length of the 
number diff ers from setting (default: Finland), acknowledge the last fi eld of 4 digits by 
leaving 0 as the fi nal digit. Remove the extra fi nal number by pressing the 

key. 

Re-enter the 3 fi nal digits and acknowledge. 

 Menu 

IO-test                   8

Test In 0000

     Out 000000

Testing of active level switch and equipment 

When the device or switch is active, the zero is replaced by a 1. During IO testing, the 
process is stopped. 

In 0000 active level switches in order: From left  

Storage tank level switch 

Process tank level switch 

Chemical tank level switch

Overfl ow pipe level switch

Out 000000 running equipment in order:

Test number key

Transfer pump 

0

Emptying pump 

1

Chemical pump 

2

Compressor

3

Sludge pump 

4

Lamp

5

To test the functionality of a device, press the corresponding number key. If you press the 

 

button, the chemical pump runs for 60 sec. while the signal lamp fl ashes. 

 Menu 

Exit                        9

The number key 9 or Enter exits the menu. 

16

Summary of Contents for WehoPuts 10

Page 1: ...WehoPuts 5 10 MINI AT URE WA S T E WAT E R T R E ATME N T PL A N T S INS TA L L AT ION A ND OPER AT ION M A NUA L 9 2014...

Page 2: ...removal using sludge bags 14 4 Treatment plant management 15 4 1 Treatment plant control unit 15 4 2 Process monitoring 15 4 3 Operation settings 16 4 4 Acknowledging alarms and reminders 17 4 5 GSM r...

Page 3: ...vers structural manufactur ing and material errors reported to and veri ed by the manufacturer Detailed warranty conditions can be found in the warranty certi cate supplied with the treatment plant MO...

Page 4: ...ent plant will automati cally resume the process from the interrupted stage Process steps 1 Wastewater batch accumulation Wastewater is directed into the storage tank without separate pre treatment Fr...

Page 5: ...875 1105 920 1160 outlet 110 110 outlet height from ground level 1335 1400 Electricity 230V 230V Distribution board main fuse 1x10A 1x10A Power supply cable MCMK 2x1 5 1 5 MCMK 2x1 5 1 5 Annual power...

Page 6: ...ank level switch 6 Over ow pipe connection 7 Machine room ventilation 8 Flushing tank 9 Chemical tank 10 Aerating plate 11 Sludge pump 12 Emptying pump 13 Process tank level switch 14 Outlet pipe conn...

Page 7: ...on pipe signal lamp ventilation pipe sludge bags sludge bag xing ring settling test measuring glass 2 2 Planning and choice of treatment plant location A plan is required for wastewater system constru...

Page 8: ...absorption well or area is measured based on the amount of water absorbed at one time and a bypass option is arranged in case of clogging It is preferable to install an inspection pipe in front of the...

Page 9: ...ant in locations where the soil contains mostly clay or high groundwater levels Lower the treatment plant into the trench using the lifting rings Install the anchor plates 4 pcs rod on the rods inside...

Page 10: ...er ow pipe in e g properties with a basement Over ow pipe and discharge pipe connection Fill the trench in layers to the level of the over ow pipe and discharge pipe connection Connect the over ow pip...

Page 11: ...d marked according to protection requirements The electricity cable is connected to the single phase socket in the treat ment plant machine room The control unit is connected to the socket with a plug...

Page 12: ...ting outward from the plant The treatment plant is entirely insulated to ground level 2 3 8 Filling and locking After installation the trench is lled up and the ground is shaped so it is slanted away...

Page 13: ...ere must be no sand or stones on the bottom of the storage and process tanks after installation 3 2 Releasing pumps For transport and installation the treatment plant pumps 2 pcs have been lifted to t...

Page 14: ...mode the compressor aerates the waste water Once a certain amount of wastewater has accumulated in the process tank the cleaning process begins 3 6 Sludge removal using a vacuum truck In the treatment...

Page 15: ...ers or alarms may be moni tored from the control unit PLC display The logic keyboard can be used for the following operational settings and choices Operating language Sludge emptying method selection...

Page 16: ...6 00 No Specifying sampling time The function is activated by choosing Yes and pressing Enter Feed the process block end time in numbers and press Enter The time is speci ed by being 7 h 30 min before...

Page 17: ...s been corrected and the alarm acknowledged The status of the treatment plant may also be supervised by status queries which the plant will reply to using SMS messages Messages correspond to readings...

Page 18: ...ault switches at least once a year The switch is checked by pressing the Test button in the control unit Pressing the button should trigger the fuse which is restored after the test NOTE You can test...

Page 19: ...age tank Sludge bag installation and replacement 1 Open treatment plant lid and move the sludge pipe to the side before removing the sludge basket picture 34 2 Lift up the entire sludge basket 3 Relea...

Page 20: ...ge removal using a vacuum truck is normally performed twice a year Vacuum truck emptying is not the default setting in the treatment plant Sludge pumping into the sludge bag is enabled until vacuum tr...

Page 21: ...tling test 4 Take sludge from the process tank on the right side into the measuring glass up to the one litre marker picture 40 5 Place the measuring glass on an even surface temperature above 0 degre...

Page 22: ...d into the treatment plant as it is a strong alkali that may lead to active sludge death Picture 42 Picture 43 Picture 44 5 5 2 Dosing and monitoring Lime is added into the treatment plant s process t...

Page 23: ...orised service vendors The periodic service and failure related service of the treatment plant are carried out by the manufacturer or a manufacturer authorised ser vice centre The owner of the propert...

Page 24: ...ince the last vacuum truck emptying The sludge bag reminder is not on by default You can activate the reminder by using the instructions in section 4 3 The replacement interval is a guideline When slu...

Page 25: ...nspected If the sludge is black in colour the active sludge has died This may be due to a long break in operation aerating malfunction or foreign substance in the treatment plant You can determine the...

Page 26: ...TE Before service ensure that the electrical supply to the treatment plant is disconnected NOTE Note the risk of falling into the tank 7 2 1 Transfer pump cleaning The transfer pump is located inside...

Page 27: ...ter cleaning ensure the free rotation of the blade wheel picture 53 Picture 48 Picture 49 Picture 50 9 Reassemble the pump after cleaning Carefully reattach the bottom plate screws Clear any accumulat...

Page 28: ...er pump chain in the storage tank The structure of the treatment plant is explained in section 1 7 Cleaning storage tank level switches see section 7 1 items 1 2 6 and 9 Cleaning process tank level sw...

Page 29: ...Operation journal dures carried out on the treatment plant DATE EVENT ALERT SERVICE PROCEDURE The property owner must regularly complete an operation journal of the operation and service proce 29...

Page 30: ...DATE EVENT ALERT SERVICE PROCEDURE 30...

Page 31: ...DATE EVENT ALERT SERVICE PROCEDURE 31...

Page 32: ...30721_ENG_09 2014 Performer Uponor Infra Ltd P O Box 21 FI 65101 Vaasa Finland T 358 20 129 211 F 358 20 129 2098 W www uponor E markkinointi uponor uponor com...

Reviews: