3. Startup
The treatment plant startup con-
sists of the following procedures:
•
Inspecting treatment plant
installation
• Releasing
pumps
•
Filling chemical container
•
GSM modem initialisation
(optional)
•
Turning on power from the
main switch
•
Selecting sludge emptying
method
sludge bag (default instal-
lation, see sections 4.3 and
5.3.1)
vacuum truck (see sections
4.3 and 5.3.2)
3.1 Installation inspection
Aft er installation, the treatment
plant is inspected for the following
items:
•
Pipe and electrical connec-
tions: to the extent possible,
verifying that connections
have been made carefully.
•
There must be no sand or
stones on the bottom of the
storage and process tanks
aft er installation.
3.2 Releasing pumps
For transport and installation, the
treatment plant pumps (2 pcs)
have been lift ed to the brackets at
the top. The compressor located in
the treatment plant machine room
has been attached with a tighten-
ing strap to the machine room
bottom plate for transport (see
equipment specifi cation 1.7).
1.
Release the transfer pump
(storage tank) and sludge
pump (process tank) from
the brackets and lower them
down.
2.
Reattach the chain.
3.
The pumps will automatically
align at the correct height.
4.
Loosen the binding strap
around the compressor. There
is no need to remove the
strap.
3.3 Filling chemical container
See instructions for fi lling the
chemical container under section
5.2.
13