AR3016G Installation and Hardware Reference Manual
4-10
Power Off Procedure
System is ready for I/Os.
4.5 Power Off Procedure
If you wish to power down the AR3016G, please follow these steps:
NOTE:
If you wish to power down the subsystem, please ensure that no time-
consuming processes, like “Regenerate Logical Drive Parity” or a
“Media Scan,” are taking place.
Step 1.
Stop I/O access to the system.
Stop all I/O access to the EonStor subsystem. Please refer to the
related documentation of your applications.
Step 2.
Flush the cache.
Locate the C_Dirty LED on the back of controller module to check
if there is still cached data in memory. Use the Shutdown Controller
function to flush all cached data. This prepares the RAID subsystem
to be safely powered down.
Step 3.
Turn off the power.
Turn off the power switches at the top of the rear panel of the
AR3016G. Once the subsystem has been powered down, other
devices that are connected to the subsystem may be powered down.
AR3016G
Ready