11
DO NOT TAKE or SEND PRODUCT BACK to where this product was purchased. Please contact Universal Fitness/FFA Corp.
for missing or defective parts at one of the following:
Phone 1-800-521-6233 or Fax 1-662-495-5038 or E-mail at
Mailing address: Universal Fitness/FFA Corp. - 100 Tubb Ave. West
Point MS 39773. Web sight www.universal-fitness.com
FIGURE 1
IMPORTANT
PLEASE READ ALL INSTRUCTIONS CAREFULLY BEFORE ASSEMBLING
FIGURE 1
Step 1.
Step 2.
Step 3.
Step 4.
Step 5.
Push three 50mm SQUARE END PLUGS (45) onto LEFT BASE BEAM (2).
Place CENTER VERTICAL FRAME (6) over last set of holes in LEFT BASE BEAM (2) and attach RIGHT BASE
BEAM (1) and CENTER VERTICAL FRAME to LEFT BASE BEAM with 3/8” x 3-5/8” HEX BOLTS (76), 3/8” WASH-
ERS (90) and 3/8” LOCKNUTS (86).
Attach CENTER FRAME (28) to RIGHT BASE BEAM (1) with 3/8” x 2-3/4” HEX BOLTS (78), 3/8” WASHERS (90) and
3/8” LOCKNUTS (86).
Attach CENTER FRAME (28), at the inside holes, to the LEFT BASE BEAM (2) with 3/8” x 2-3/4” HEX BOLTS (78), 3/
8” WASHERS (90) and 3/8” LOCKNUTS (86).
Attach CENTER FRAME (28) and PULLEY BRACKET PLATES (3), at outside holes, to the LEFT BASE BEAM (2)
with 3/8” x 3-5/8” HEX BOLTS (76), 3/8” WASHERS (90) and 3/8” LOCKNUTS (86).
NOTE: The short end of the PULLEY BRACKET
PLATES must be facing up as shown.