![UNITED Nitrogen Pac SC-W Installation, Commissioning Maintenance Download Page 3](http://html1.mh-extra.com/html/united/nitrogen-pac-sc-w/nitrogen-pac-sc-w_installation-commissioning-maintenance_4004736003.webp)
UNITED FIRE SYSTEMS -
NITROGEN-
PAC™
MODEL SC-W
INSTALLATION, COMMISSIONING, AND MAINTENANCE MANUAL
REVISION 1.01 MAR 2021 - P/N 30-NPWICM-000
i
INDEX
Section
Description
Page
INDEX
List Of Figures
iv
List Of Tables
v
List Of Abbreviations
vi
Safety Information
vii
Foreword
ix
1.
GENERAL INFORMATION
1
1.1
Glossary
1
1.2
System Purpose
2
1.3
Functional Description
3
1.4
Model SC-W Assembly
– Internal Arrangement
5
1.5
Model SC-W Assembly
– External Arrangement
7
1.5.1
Connections
7
1.5.2
Indicators
7
1.5.3
Controls
7
1.5.4
Other
7
1.6
Nitrogen Receiver
– Model NR-5
9
1.7
Nitrogen Receiver
– Model NR-10
10
1.8
Nitrogen / Air Maintenance Device
– Model NAMD-1
11
1.9
Purge Vent Assemblies
12
1.9.1
Purge Vent Assembly
– Model PVA-4 (For Manual Purging)
12
1.9.2
Purge Vent Assembly
– Model PVA-2 (For TRUE ADVANCED PURGE (TAP) Device)
13
1.10
N
2
Purity Analyzer
– Hand-Held – Model NA-2
14
1.11
(Optional) TRUE ADVANCED PURGE (TAP) Device
– Model TAP-G3
15
1.12
(Optional) Corrosion Monitor Assembly
– Model CMA-1
16
2.
EQUIPMENT SELECTION
17
2.1
Introduction
17
2.2
Basis for Equipment Selection
17
2.3
Steps to Follow
17
2.4
Information To Be Obtained During Survey
17
2.5
System Arrangements
19
2.5.1
Type
I
Arrangement
19
2.5.2
Type
II
Arrangement
20
2.6
Ensuring the
NITROGEN-
PAC™
Model SC-W is Appropriate for the Sprinkler System in Use
21
2.6.1
Maximum Number Of Risers
21
2.6.2
Determining Volume (In Gallons) Of Each Sprinkler Riser
21
2.6.3
Maximum Volume Of Single Largest Riser
22
2.6.4
Maximum Volume Of All Risers
22
2.6.5
Required Supervisory Pressure
22
2.6.6
Type
I
Arrangements
– Model SC-W Assembly for Initial-Fill with Air
22
2.6.7
Type II Arrangements
– External Air Compressor for Initial-Fill with Air
22
2.6.8
Are Sprinkler Systems NEW or EXISTING?
22
2.6.9
Are Sprinkler Systems Equipped with Quick-Opening Devices (Dry Accelerators)?
23
2.6.10
Nitrogen Receiver
23
2.6.11
Nitrogen / Air Maintenance Device
– Model NAMD-1
23
Summary of Contents for Nitrogen Pac SC-W
Page 2: ... THIS SURFACE DELIBERATELY LEFT BLANK ...
Page 102: ...APPENDIX F SC W MANUAL ...
Page 103: ...APPENDIX F SC W MANUAL ...
Page 104: ...APPENDIX G SC W MANUAL ...