11.8 -
Variable frequency drive maintenance
CAUTION: Before any work on the variable drive, ensure that
the circuit is isolated and there is no voltage present
(reminder: capacitor discharge time: approximately 5 minutes
after the circuit breaker is opened). Only appropriately
qualified personnel are authorised to work on the variable
frequency drive.
In case of any alarm or persistent problem related to the variable
frequency drive, contact Carrier Service.
The variable drives fitted on 30RQM/30RQP units do not require
a dielectric test, even if being replaced: they are systematically
verified before delivery. Moreover, the filtering components
installed in the variable drive can falsify the measurement and
may even be damaged. If it is necessary to test the insulation of
the unit components (fan motors and pumps, cables, etc.), the
variable frequency drive must be disconnected from the power
circuit.
11.9 -
Characteristics of R-410A
11.9.1 -
See the table below.
Saturated temperatures based on the gauge pressure (in kPa)
Saturated Temp.
Pressure
gauge
Saturated Temp.
Pressure
gauge
Saturated Temp.
Pressure
gauge
Saturated
temp.
Pressure
gauge
-20
297
4
807
28
1687
52
3088
-19
312
5
835
29
1734
53
3161
-18
328
6
864
30
1781
54
3234
-17
345
7
894
31
1830
55
3310
-16
361
8
924
32
1880
56
3386
-15
379
9
956
33
1930
57
3464
-14
397
10
987
34
1981
58
3543
-13
415
11
1020
35
2034
59
3624
-12
434
12
1053
36
2087
60
3706
-11
453
13
1087
37
2142
61
3789
-10
473
14
1121
38
2197
62
3874
-9
493
15
1156
39
2253
63
3961
-8
514
16
1192
40
2311
64
4049
-7
535
17
1229
41
2369
65
4138
-6
557
18
1267
42
2429
66
4229
-5
579
19
1305
43
2490
67
4322
-4
602
20
1344
44
2551
68
4416
-3
626
21
1384
45
2614
69
4512
-2
650
22
1425
46
2678
70
4610
-1
674
23
1467
47
2744
0
700
24
1509
48
2810
1
726
26
1596
49
2878
2
752
25
1552
50
2947
3
779
27
1641
51
3017
Aquasnap units use high pressure R-410A refrigerant (the unit operating pressure is above 40 bar, the pressure at 35°C air temperature
is 50% higher than for R-22). Special equipment must be used when working on the refrigerant circuit (pressure measurement, charge
transfer, etc.).
11.10 -
Check of power factor correction
capacitors
The verification consists in measuring input current of each
capacitor bank. Check shall be done using a true RMS meter
reading:
Check per phase current delivered by each capacitor and compare
it to nominal values. In case of capacitance losses or unbalance,
the capacitors must be replaced.
Ensure that the current through the capacitor doesn’t exceed
1.3xIr. A higher value may indicate heavy presence of harmonics,
that will impact the lifetime of the capacitor.
Absence of current despite capacitor is energized is an indication
that there is a defect. Confirmation shall be done by removing the
capacitors and checking the underside
Defective
Correct
11 - STANDARD MAINTENANCE
58
Summary of Contents for Carrier 30RQM 160
Page 63: ......