Unitary products group AHC9V UP Installation Manual Download Page 12

271043-UIM-B-0707

12

Unitary Products Group

ACCESSORY CONNECTIONS

The furnace control will allow power-switching control of various acces-
sories. Refer to Figure 7, for connection details.

ELECTRONIC AIR CLEANER CONNECTION

Two 1/4” (6.4 mm) spade terminals (EAC and NEUTRAL) for electronic
air cleaner connections are located on the control board. The terminals
provide 115 VAC (1.0 amp maximum) during circulating blower opera-
tion.

HUMIDIFIER CONNECTION

Two 1/4” (6.4 mm) spade terminals (HUM and NEUTRAL) for humidifier
connections are located on the control board. The terminals provide 115
VAC (1.0 amp maximum) during heating system operation.

TWINNING

These furnaces are not to be twinned. If more than one furnace is
needed in an application, each furnace must have its own complete
duct system and its own wall thermostat.

SECTION VI: COMBUSTION AIR AND 

VENT SYSTEM

COMBUSTION AIR AND VENT SAFETY

This Category IV, dual certified direct vent furnace is designed for resi-
dential application. It may be installed without modification to the con-
densate system in a basement, garage, equipment room, alcove, attic
or any other indoor location where all required clearance to combusti-
bles and other restrictions are met. The combustion air and the venting
system must be installed in accordance with Section 5.3, Air for Com-
bustion and Ventilation, of the National Fuel Gas Code Z223.1/NFPA 54
(latest edition), or Sections 7.2, 7.3 or 7.4 of CSA B149.1, National Gas
and Propane Codes (latest edition) or applicable provisions of the local
building code and these instructions.

IMPORTANT: 

The “VENT SYSTEM” must be installed as specified in

these instructions for Residential and Non HUD Modular Homes. The
sealed combustion air / vent system is the only configuration that can
be installed in a Non HUD Modular Home.

COMBUSTION AIR/VENT PIPE SIZING

The size of pipe required will be determined by the furnace model, the
total length of pipe required and the number of elbows required.

Table 8 lists the maximum equivalent length of pipe allowed for each
model of furnace. The equivalent length of elbows is shown in Table 9.
The equivalent length of the vent system is the total length of straight
pipe PLUS the equivalent length of all of the elbows.

The following rules must also be followed:

1.

Long radius (sweep) elbows are recommended. Standard elbows
may be used, but since they have a longer equivalent length, they
will reduce the total length of pipe that will be allowed. Short radius
(plumbing vent) elbows are not allowed. The standard dimensions
of the acceptable elbows are shown below.

2.

The maximum equivalent length listed in Table 8 is for the vent pip-
ing and the air intake piping separately. For example, if the table
allows 65 equivalent feet for a particular model, then the vent can
have 65 equivalent feet of pipe, AND the combustion air intake can
have another 65 equivalent feet of pipe.

3.

Three vent terminal elbows (two for the vent and one for the com-
bustion air intake) are already accounted for and need not be
included in the equivalent length calculation.

4.

All combustion air and vent pipe must conform to American
National Standards Institute (ANSI) and American Society for Test-
ing and Materials (ASTM) standards D1785 (Schedule 40 PVC),
D2665 (PVC-DWV), F891 (PVC-DWV Cellular Core), D2261
(ABS-DWV) or F628 (Schedule 40 ABS). Pipe cement and primer
must conform to ASTM Standard D2546 (PVC) or D2235 (ABS). If
ABS pipe is to be used, any joint where ABS pipe is joined to PVC
pipe must be glued with cement that is approved for use with
BOTH materials. Metallic materials must not be used for venting or
air intake.

5.

If a flexible connector is used in the vent system, it must be made
of a material that is resistant to acidic exposure and to at least
225° F temperature. Flexible connectors are also allowed in the
combustion air pipe. 

6.

All models are supplied with 2" vent connections. When the pipe
must be increased to 3" diameter, the transition from 2" to 3" must
be done as close to the furnace as possible. For upflow models,
the transition from 2" to 3" should be done immediately above the
furnace. For downflow or horizontal models, the transition from 2"
to 3" pipe should be done immediately after the drain tee or drain
elbow.

7.

In Canada, vents shall be certified to ULC S636, Standard for Type
BH Gas Venting Systems. IPEX System 636 PVC is certified to
this standard.

8.

In Canada, the first three feet (900 mm) of the vent must be readily
accessible for inspection.

 FIGURE 7:  

Accessory Connections

 This furnace may not be common vented with any other appliance,
since it requires separate, properly sized air intake and vent lines.
The furnace shall not be connected to any type of B, BW or L vent
or vent connector, and not connected to any portion of a factory-
built or masonry chimney
The furnace shall not be connected to a chimney flue serving a sep-
arate appliance designed to burn solid fuel.

115 VOLT
HUMIDIFER

115 VOLT
ELECTRONIC
AIR CLEANER

EAC HOT

HUM. HOT

BLK

WHT

EAC

HUM

NEUTRALS

SWITCHED
CIRCUITS

BLK

WHT

When combustion air pipe is installed above a suspended ceiling or
when it passes through a warm and humid space, the pipe must be
insulated with 1/2” Armaflex or other heat resistant type insulation if
two feet or more of pipe is exposed.
Vent piping must be insulated if it will be subjected to freezing tem-
peratures such as routing through unheated areas or through an
unused chimney.

Summary of Contents for AHC9V UP

Page 1: ...electrical and mechanical codes LIST OF SECTIONS SAFETY 1 DUCTWORK 4 FILTERS 6 GAS PIPING 7 ELECTRICAL POWER 8 COMBUSTION AIR AND VENT SYSTEM 12 CONDENSATE PIPING 18 SAFETY CONTROLS 19 START UP AND AD...

Page 2: ...ible materials as listed under Clearances to Combustibles in Table 1 Provide clearances for servicing ensuring that service access is allowed for both the burners and blower These models ARE NOT CSA l...

Page 3: ...or and the furnace must be located or protected to avoid physical damage by vehicles The furnace area must not be used as a broom closet or for any other storage purposes as a fire hazard may be creat...

Page 4: ...NOTE When attaching duct flange do not shoot the screw down into the casing Use the formed flange intended for duct flange attachment The duct system is a very important part of the installation If th...

Page 5: ...e presence of leaks in the heat exchanger This access cover shall be attached in such a manner as to prevent leaks TABLE 2 Minimum Duct Sizing For Proper Airflow Input Cabinet Airflow Return1 Rectangu...

Page 6: ...provided with that accessory for proper hole cut size SECTION III FILTERS FILTER INSTALLATION All applications require the use of a filter Filters must be installed external to the furnace cabinet DO...

Page 7: ...igure 1 dimensions The inlet to the gas valve lines up directly with the opening in the left side of the furnace casing To line up with the opening in the right side of the casing two street ells shou...

Page 8: ...5 1 4 1 3 39 1 0 37 0 34 0 31 1100 1 3 1 2 1 1 41 0 0 34 0 31 0 28 2500 LP 4 1 3 8 3 5 93 2 LP 1 03 0 95 0 87 PROPANE AND HIGH ALTITUDE CONVERSION KITS It is very important to choose the correct kit...

Page 9: ...o the terminal board on the ignition module as shown in Figures 5 and 6 Electronic thermostats may require the common wire to be connected as shown in Figures 5 and 6 Apply strain relief to thermostat...

Page 10: ...ight O Reversing Valve Energized in Cool TWO STAGE AIR CONDITIONING Comfort Alert Interface HUM Dehumidification Open on Humidity Rise C 24 Volt Common C 24 Volt Common R 24 Volt Hot W2 Second Stage H...

Page 11: ...W2 Delay on furnace to OFF HM Humidistat BSG Bonnet Sensor Bonnet Sensor Optional BS Bonnet Sensor AUX Auxiliary Heat E W1 First Stage Auxiliary Heat E W1 First Stage Auxiliary Heat W Auxiliary Heat Y...

Page 12: ...length listed in Table 8 is for the vent pip ing and the air intake piping separately For example if the table allows 65 equivalent feet for a particular model then the vent can have 65 equivalent fe...

Page 13: ...piping apply cement primer and the cement per the manufactures instructions Primer and cement must conform to ASTM D2564 for PVC or ASTM D2235 for ABS piping 7 All joints must provide a permanent air...

Page 14: ...ns 9 inches 23 cm for models 50 000 BTUH 15 kW 12 inches 30 cm for models 50 000 BTUH 15 kW C Clearance to permanently closed window 12 inches 30 cm 12 inches 30 cm D Vertical clearance to ventilated...

Page 15: ...systems must be installed so the vent and the combustion air pipes terminate in the same atmospheric zone Refer to Figures 11 or 12 VENTING MULTIPLE UNITS Multiple units can be installed in a space or...

Page 16: ...vent Care should be taken to locate side vented systems where trees or shrubs will not block or restrict supply air from entering the terminal Also the terminal assembly should be located as far as p...

Page 17: ...LE VENT GAS VENT SOFFIT VENT VENTILATED ATTIC TOP ABOVE INSULATION OPTIONAL INLET a OUTLET AIR a VENTILATED CRAWL SPACE GAS WATER HEATER VENTILATED ATTIC TOP ABOVE INSULATION GAS VENT GABLE VENT SOFFI...

Page 18: ...Air The ventilated attic space or a crawl space from which the combustion air is taken must comply with the requirements specified in AIR SOURCE FROM OUTDOORS in this instruction or in Section 5 3 Air...

Page 19: ...e controls are mounted on the burner box assembly If the temper ature in the burner box exceeds its set point the ignition control and the gas valve are de energized The operation of this control indi...

Page 20: ...ll start and come up to speed Shortly after inducer start up the hot surface igniter will glow for about 17 seconds b After this warm up the ignition module will energize open the main gas valve c Aft...

Page 21: ...3600 then divided by the time it took to measure 0 10 m3 of gas from the gas meter For Propane LP Gas multiply the Heat content of the gas MJ m3 or Default 93 15 times 0 10 m3 of gas measured at the...

Page 22: ...shown in Figure 21 The procedure below is used to adjust either the high fire manifold pressure or the low fire manifold pressure IMPORTANT The cap for the pressure regulator must be removed entirely...

Page 23: ...blown into the heated space The fan off timing may be adjusted by positioning the jumper on two of the four pins as shown in Figure 23 WITH BURNER BOX COVER IN PLACE WITH BURNER BOX COVER REMOVED FIG...

Page 24: ...een the R and W terminals The indoor fan motor is energized through the W1 heat terminal and runs on the speed selected on the HEAT tap of the control board Humidistat When a humidistat is installed i...

Page 25: ...T CODE STORAGE AND RETRIEVAL The control in this furnace is equipped with memory that will store up to five error codes to allow a service technician to diagnose problems more easily This memory will...

Page 26: ...A C 52 1 35 4 53 2 35 4 1560 1010 1620 1030 C B 44 2 28 6 45 9 29 2 1470 940 1500 960 B C 41 6 26 6 42 5 27 2 1370 890 1410 880 D B 38 8 25 2 39 9 24 9 1460 930 1490 920 C A 41 3 26 3 42 2 26 1 1250 7...

Page 27: ...in in2 cm2 In W C kPA In W C kPA In W C kPA 0 750 0 21 4 230 1484 0 01 0 00249 0 01 0 00249 0 15 0 03736 751 1000 21 25 28 32 330 2129 0 05 0 01245 0 05 0 01245 0 20 0 04982 1001 1250 28 33 35 40 330...

Page 28: ...Printed in U S A 271043 UIM B 0707 Copyright by York International Corp 2007 All rights reserved Supersedes 271043 UIM A 0407 Unitary 5005 Norman Products York OK Group Drive 73069 SECTION X WIRING D...

Reviews: