![UNIRAC EcoFoot5DTM Installation Manual Download Page 22](http://html1.mh-extra.com/html/unirac/ecofoot5dtm/ecofoot5dtm_installation-manual_3922613022.webp)
INSTALLATION GUIDE
PAGE
HIGH DENSITY 5-DEGREE
BALLAST RACKING SYSTEM
19
STEP 10:
Using Strut Strap Components shown, attach North
row Strut Strap to Wind Defl ector and Strut.
STEP 12:
Attach L-Bracket 1 to Roof Attachment.
Place long side of L-Bracket on Roof Attachment and
secure L-Bracket 1 to Roof Attachment with Bolt.
Torque Bolt to 14 ft-lbs.
STEP 13:
Attach L-Bracket 2 to L-Bracket 1 by butting fl at
sides and bolting together.
Use included L-Bracket Bolt to secure two L-Feet
together.
Torque Bolt to 14 ft-lbs.
STEP 11:
Place Bolt behind Wind Defl ector and bottom of Strut Strap in Strut channel.
Torque Bolt to 14 ft-lbs.
ROOF ATTACHMENT WITH STRUT
NOTE:
If you are using OMG Roof Attachment,
see guidelines on the next page for
correct installation of L-Bracket 2.