INSTALLATION GUIDE
PAGE
HIGH DENSITY 5-DEGREE
BALLAST RACKING SYSTEM
14
CLAMPING TO SECURE SINGLE MODULE OF STEPPED ARRAY
CLAMPING TO SECURE TWO MODULES OF STEPPED ARRAY
• Position module to align with positioning dot at outer edge of
Clamp. This will engage 1 ¾" of Clamp with module frame. Align
Base as needed to position Clamp. Base will be slightly out of par-
allel.
Torque Nut to 14 ft-lbs using a 1/2" deep socket.
Position Clamp in typical two-module clamping position and
torque Nut.
Torque the nut to 14 ft-lbs.
1 ¾"
Positioning Dots
Clamp Securing Single PV Module
Clamp Securing Two PV Modules
STEPPED ARRAY INSTALLATION