INSTALLATION GUIDE
PAGE
HIGH DENSITY 5-DEGREE
BALLAST RACKING SYSTEM
10
Step 5 – Install Ballast Tray and place ballast blocks on Tray
• Slide tray into retention clips located on the Base by sliding the Tray
along the east-west direction.
• Secure tray to Mid-Support using 5/16” thread forming screw provided
with Mid-Support Kit.
Torque Screw to 14 ft-lbs.
• Place ballast (not included) in a single layer evenly dispersed along the
length of Ballast Trays. Apply ballast per the ballast plan specifi ed in the
PE Certifi ed Ballast Plan – Sheet S-1.0.
Step 6 – Install Wind Defl ector
Place Wind Defl ectors into slot on EcoFoot5D Base and attach to Rocker
using Nut provided.
Torque Nut to 14 ft-lbs using a ½” deep socket.
Application of anti-seize on threaded post recommended.
Rocker Nut
Ballast Tray
Ballast Tray
5/16" Screw
Base
Retention
Clips
Base
Retention
Clip
Wind Defl ector
SYSTEM INSTALLATION STEPS