![background image](http://html.mh-extra.com/html/union/pury-250e/pury-250e_user-manual_842959019.webp)
Manual Pury 250e
Maintenance
Manual Pury 250e 2006-06-08
19
6. Maintenance
During maintenance, all installation and process specific safety instructions must be
observed before work can begin. Maintenance may only be carried out by trained
personnel. Following maintenance, the assembly must be leak tested before being
returned to service.
6.1.
Capillary cooler with filter
The wire mesh filter inserts can be steam cleaned or exchanged depending on the
level of contamination. The O-ring seals must also be carefully be checked for
damage and replaced if necessary.
Figure 6 : Capillary cooler with filter unit
1
Top section with O-ring NBR 43x3mm
4
Wire filter- fine mesh
2
Filter seat with O-Ring NBR 43x3mm
5
Wire filter – coarse mesh
3
Condensate collector with O-Ring NBR 45x3mm
Summary of Contents for Pury 250e
Page 1: ...Users Manual Pury 250e Gas Purification System ...
Page 6: ...Introduction Manual Pury 250e 6 Manual Pury 250e 2006 06 08 ...
Page 8: ...Installation Manual Pury 250e 8 Manual Pury 250e 2006 06 08 ...
Page 14: ...Commissioning Manual Pury 250e 14 Manual Pury 250e 2006 06 08 ...
Page 18: ...Maintenance Manual Pury 250e 18 Manual Pury 250e 2006 06 08 ...
Page 22: ...Circuit Diagrams Manual Pury 250e 22 Manual Pury 250e 2006 06 08 ...