Chapter 2 Installation and Wiring
9
Fig 2-7 M8
×
70 socket head cap screws
(
front
)
Fig 2-8 Back view of front maintenance Installation Details
2.2.2 Installation of Fixed LED Display-Rear Installation(Optional)
1)
Check whether the bottom beam is level. Make sure that its levelness is within
±1mm.
2)
Install the cabinets sequentially from bottom to top and from middle to both sides.
In addition, fix the connecting plates and cabinets with installation screws to the
square tubes.
3)
Keep proper joints and flatness between the cabinets during cabinet installation.
4)
After the installation of the cabinet is completed,Connect the power cable and the
signal cable between the cabinets;
5)
The installation of the screen is completed.
M8×70 Inner
hexagon bolt
Mounting plate
Summary of Contents for ULW III
Page 1: ...UMini Product Manual I...
Page 2: ......
Page 3: ...ULW Product Manual I...
Page 24: ...Chapter 2 Installation and Wiring 14 Fig 2 21 Rear Mounting Plate...
Page 67: ...Chapter 4 LED Display Playing Setting 57 Fig 4 28 Opening a Playing Solution File...
Page 84: ...74...
Page 85: ......
Page 86: ......