31
SCREEN 1
VOLTAGE
AT LEADS
/DUT
SCREEN 2
VOLTAGE
DURING
TEST
SCREEN 3
SET
VOLTAGE
CURRENT AT
END OF
DISCHARGE
TIME
CURRENT AT
END OF
CHARGE
TIME
⚫
You can save the data of this test by pressing the
button. After pressing this button
a message will appear to tell you about the
fi
le number. You can press the OK button on
the message box in order to go back to the measurement screen.
Please note that if in any test the test current reaches beyond 1 mA, the meter will take a
response time of about 10 min to display accurate readings for a current below 10 nA. This
time can be reduced by turning hardware
fi
lter off.
Please note that the capacitance measurement is not available in the STEP and RAMP modes
of measurement.
Please note that for the proper measurement of capacitance of DUT the test should be run till
the voltage of DUT reaches the set voltage.
Summary of Contents for ISO-5
Page 1: ...Operating Manual ISO 5 5 kV Digital Insulation Tester ISO 10 10 kV Digital Insulation Tester...
Page 2: ...2...
Page 63: ...60...
Page 64: ...61...