22
min
sec
button button
Interval = test time/5
In the
fi
rst interval a test voltage of V/5 volts is applied to the DUT where V is the voltage
selected in the control window. At the end of each interval the test voltage is increased by V/5
volts. So in the last interval the test voltage will become V volts. The value at the end of each
interval is stored by the meter.
The steps to take a test in STEP mode are as follows:
⚫
To enter the step mode press the
icon on the home screen and following screen
will be displayed.
⚫
To setup the basic settings of the mode press the
icon. The control window will
appear as shown below.
Summary of Contents for ISO-5
Page 1: ...Operating Manual ISO 5 5 kV Digital Insulation Tester ISO 10 10 kV Digital Insulation Tester...
Page 2: ...2...
Page 63: ...60...
Page 64: ...61...