Unified Brands Randell DPM Series Operator'S Manual Download Page 6

6          

800-621-8560

 

NOTICE:  FOOD LOSS IS NOT COVERED UNDER WARRANTY  

 

3.  Repairs  caused  by  abuse  such  as  broken  glass,  freight  damage, 

excessive force, or scratches and dents. 

4.  Electrical  component,  mechanical,  or  equipment  failure  due  to  water 

damage from cleaning or maintenance procedures. 

5.  Drawer repairs that are the result of improper drawer track installation. 

 
QUOTATIONS 
Verbal  quotations  are  provided  for  customer  convenience  only  and  are 
considered  invalid  in  the  absence  of  a  written  quotation.    Written  quotations 
from Randell are valid for 30 days from quote date unless otherwise specified.  
Randell assumes no liability for dealer quotations to end-users. 
 
SPECIFICATION & PRODUCT DESIGN 
Due to continued product improvement, specification and product design may 
change  without  notice.    Such  revisions  do  not  entitle  the  buyer  to  additions.  
Changes or replacements for previously purchased equipment. 
 
SANITATION REQUIREMENTS 
Certain  areas  require  specific  annotation  requirements  other  than  N.S.F.  & 
U.L.  standards.    Randell  must  be  advised  of  these  specifications  before 
fabrication of equipment.  In these special circumstances, a revised quotation 
may  be  required  to  cover  additional  costs.    Failure  to  notify  Randell  before 
fabrication holds the dealer accountable for all additional charges. 
 
CANCELLATIONS 
Orders 

canceled 

prior 

to 

production 

scheduling 

entered 

into 

engineering/production  and  cancelled  are  subject  to  a  cancellation  charge 
(contact factory for details). 
 
STORAGE CHARGES 
Randell  makes  every  effort  to  consistently  meet  our  customer’s  shipment 
expectations.    If  after  the  equipment  has  been  fabricated,  the  customer 
requests delay in shipment, and warehousing is required: 
 

1.  Equipment  held for  shipment  at  purchasers  request for  a  period  of  30 

days  beyond  original  delivery  date  specified  will  be  invoiced  and 
become immediately payable. 

2.  Equipment  held  beyond  30  days  after  the  original  delivery  date 

specified will also include storage charges. 

 
SHIPPING & DELIVERY 
Randell  will  attempt  to  comply  with  any  shipping,  routing  or  carrier  request 
designated  by  dealer,  but  reserves  the  right  to  ship  merchandise  via  any 
responsible  carrier  at  the  time  equipment  is  ready  for  shipment.    Randell  will 
not  be  held  responsible  for  any  carrier  rate  differences;  rate  differences  are 
entirely  between  the  carrier  and  purchaser.    Point  of  shipping  shall  be 
determined  by  Randell  (Weidman,  MI/Jackson,  MS).    At  dealer’s  request, 
Randell  will  endeavor  whenever  practical  to  meet  dealer’s  request.    Freight 
charges to be collect unless otherwise noted. 
 
 
 

Summary of Contents for Randell DPM Series

Page 1: ...the responsibility of the consignee to inspect the container upon receipt of same and to determine the possibility of any damage including concealed damage Randell suggests that if you are suspicious of damage to make a notation on the delivery receipt It will be the responsibility of the consignee to file a claim with the carrier We recommend that you do so at once 525 South Coldwater Road Weidma...

Page 2: ... your recent purchase of Randell food service equipment and welcome to the growing family of satisfied Randell customers Our reputation for superior products is the result of consistent quality craftsmanship From the earliest stages of product design to successive steps in fabrication and assembly rigid standards of excellence are maintained by our staff of designers engineers and skilled employee...

Page 3: ...design and specifications without prior notice NOTICE Please read the entire manual carefully before installation If certain recommended procedures are not followed warranty claims will be denied MODEL NUMBER _________________________ SERIAL NUMBER _________________________ INSTALLATION DATE _____________________ The serial number is located in refrigerated base on the interior rear wall Serial ta...

Page 4: ...was shipped to a site other than the final installation site Randell will warranty for a period of three months following installation with proof of starting date up to a maximum of fifteen months from the date of purchase 2 Free ground freight of customer specified location for all in warranty parts within continental U S Component part warranty does not cover glass breakage or gasket replacement...

Page 5: ...y Randell offers both 1 and 2 year extensions Labor extensions begin at the end of our standard warranty and extend out 9 months to 1 calendar year or 21 months to 2 calendar years from date of purchase Please contact Randell technical service hotline at 1 800 621 8560 for details and any question on Authorized Service Agents ASA WHEN EXPORT WARRANTIES APPLY 1 Randell covers all non electrical com...

Page 6: ...r additional costs Failure to notify Randell before fabrication holds the dealer accountable for all additional charges CANCELLATIONS Orders canceled prior to production scheduling entered into engineering production and cancelled are subject to a cancellation charge contact factory for details STORAGE CHARGES Randell makes every effort to consistently meet our customer s shipment expectations If ...

Page 7: ...king the return authorization number will be refused all additional freight costs to be borne by the returning party Returned equipment must be shipped in original carton freight prepaid and received in good conditions Any returned merchandise is subject to a minimum handling charge consult factory for rate INSTALLATION Equipment installation is the responsibility of the dealer and or their custom...

Page 8: ...H Work Hgt Doors H P Volts Amp NEM A R 404A OZ Cub Ft DPM74 74 34 51 36 2 27 1 2 115 12 5 15P 16 16 DPM90 90 34 51 36 3 24 3 4 115 12 8 5 20P 26 20 DPM102 102 34 51 36 3 27 3 4 115 12 8 5 20P 40 22 DPM120 120 34 51 36 3 27 3 4 115 12 8 5 20P 40 22 DPM120R Pictured ...

Page 9: ...gnment and seal 4 Power up unit once plugged in 5 Allow unit time to cool down to holding temperature 6 Refer to the front of this manual for serial number location Please record this information in your manual on page 3 now It will be necessary when ordering replacement parts or requesting warranty service 7 Confirm that the unit is holding temperature 8 Allow your unit to operate for approximate...

Page 10: ...o product is available or necessary fill empty pans with 1 to 2 of water as an insulating barrier Note Even though your DPM series was designed for heavy use excessive door openings should be avoided in order to maintain proper box temperature and eliminate the possibility of coil freeze up Your DPM series preparation table was equipped with a temperature adjustment control for the refrigerated ra...

Page 11: ...L 1 Remove product from the rail at the end of the day s preparation The product may either be stored in the lower base compartment or any other suitable holding cabinet 2 Turn off the rail with the switch located inside the mechanical compartment 3 Unit cleaning may be performed at this time if the frost has melted off the surface It is recommended that cleaning of the rail take place at nightly ...

Page 12: ...ve until all water has drained 4 Close valve 5 Discard water PULL OUT SHELF REMOVAL AND INSTALLATION Pull out Shelf Removal To remove the individual extendable shelf 1 Fully extend the shelf that is to be removed 2 Remove product pans from shelf 3 Lift up the drawer stop tabs on each side of shelf track 4 Pull shelf out while lifting the tabs ...

Page 13: ...unifiedbrands net 13 Unit Operation cont Shelf Installation To remove and re install individual drawers and drawer tracks please refer to Figure 2 below for proper installation instructions Figure 2 ...

Page 14: ...al instructions 2 Locate bracket located on interior rear wall of cabinet 3 Loosen the two thumb screws completely screws will not come out If screws will not loosen with hand use flat blade screwdriver 4 Loosen locator screws at front lower portion of module where it meets the front of unit 5 Remove shelf cartridge ...

Page 15: ...ormally vertically as to not damage or restrict air from passing through condenser 2 Clean fan blade on the condensing unit 3 Clean and disinfect drains with a solution of warm water and mild detergent 4 Clean and disinfect drain lines and evaporator pan with a solution of warm water and mild detergent 5 Clean all gaskets on a weekly if not daily basis with a solution of warm water and a mild dete...

Page 16: ...USE HYDROCHLORIC ACID MURIATIC ACID ON STAINLESS STEEL Proper maintenance of equipment is the ultimate necessity in preventing costly repairs By evaluating each unit on a regular schedule you can often catch and repair minor problems before they completely disable the unit and become burdensome on your entire operation For more information on preventive maintenance consult the local ASA or CFESA m...

Page 17: ...unifiedbrands net 17 Electrical Diagram DPM Series ...

Page 18: ...ser coil dirty 1 Clean coil 2 Condenser fan faulty 2 Service condenser motor 3 Gaskets not sealing 3 Replace gaskets 4 Covers off unit 4 Re apply covers Rail not cold enough base temp OK 1 Temperature control set too high 1 Adjust control to lower setting 2 Temperature control faulty 2 Test control 3 Condenser coil 3 Clean coil 4 Solenoid valve not energized 4 Check t stat for power to solenoid 5 ...

Page 19: ...unifiedbrands net 19 Replacement Parts DPM Series exploded view ...

Page 20: ...20 800 621 8560 Replacement Parts DPM Series exploded view Top assembly ...

Page 21: ...unifiedbrands net 21 Replacement Parts DPM Series exploded view Coil Assembly ...

Page 22: ...22 800 621 8560 Replacement Parts DPM Series exploded view Pull out shelf and Dough Rack ...

Page 23: ...unifiedbrands net 23 Replacement Parts DPM Series exploded view Door Assembly ...

Page 24: ...24 800 621 8560 Replacement Parts DPM Series exploded view Mechanical Area ...

Page 25: ... PIN210 X X X X 22 Spillage grate 21 75 x 16 HD SHL004N X X X 22A Spillage grate 24 75 x 16 HD SHL003N X X X 23 Catch pan 24 x 16 HD PAN0701 X X 23A Catch pan 21 x 16 HD PAN0702 X X 23B Catch pan 22 75 x 16 HD PAN0703 X 24 Door right hand 23 75 x 24 5 RP DOR657R X 24A Door right hand 26 75 x 24 5 RP DOR628R X X X 25 Door left hand 23 75 x 24 5 RP DOR657L X 25A Door left hand 26 75 x 24 5 RP DOR628...

Page 26: ...24 75 x 4 DO SHD003 X 95 Removable catch pan deflector DO DIV0001 X X X X 98 Louver magnet striker plate HD STR9901 X X X X 99 Louver magnet HD CTH9901 X X X X 100 Hinge louver only RP HNG9900 X X X X 102 Louver 20 x 24 5 left hinge DP LVR22 X 102A Louver 18 x 24 5 left hinge DP LVR18L X 102B Louver 21 x 24 5 left hinge DP LVR21 X X 102C Louver 20 x 24 5 right hinge DP LVR22R X 102D Louver 18 x 24...

Reviews: