01865 767676
www.unicol.com
3
Revised 15/12/20
POSITIONING OF SERVICES
STEP 1
Partially unwind hex head screws to release arms.
Lift off arms and place aside.
STEP 2
Remove x2 M6x12 pozi pan head screws from
handle in transport position (left image).
Screw handle in operational position using same
screws (right image)
STEP 3
Take out removeable cassette and populate with
your media equipment.
Recommended position - either side of the
VTS and behind the screen (size dependant).
Do
NOT
position services within body of VTS
or within cassette path.
HTS1: 1185x785mm | HTS2: 906x635mm
Additional space for VTS1 only - dependant on
the size of screen
(check before installing).