background image

21

22

9.3.1.1 Continuous Insulation Resistance Measurement

When the tester is powered on, it enters the default mode of continuous insulation 

resistance measurement (250V output voltage). Connect test leads with measured 

object, press 

 

and ▼ to select high-voltage range, press      and      to select fine-

tuned step voltage, then press “TEST” to perform test, the LCD shows basic elements 

including battery power, high-voltage warning symbol (“2Hz” flashes), leakage current, 

real-time output voltage, measured insulation resistance, testing value of analog bar 

graph, continuous measurement duration, storage capacity, etc. Press “TEST” to 

end the testing, turn off the testing voltage of insulation resistance, turn off the testing 

indicator light, and automatically discharge fast (discharge course is displayed), the 

LCD maintains current measured element on it.

9.3.1.2 Timer Measurement

Under insulation resistance testing condition without high voltage output, press “TIME” 

to enter timer measurement mode.

When cycling through in insulation resistance measurement mode, the display of 

timer measurement mode differs from that of other measurement modes. 

There is no time setting interface in the default continuous mode interface, there is 

PI symbol for polarization index measurement, and there is DAR symbol for absorption 

ratio measurement.

When entering timer measurement mode, Time1 and timer symbol are displayed on 

LCD, the default countdown of 05:00 flashes (mantissa) to indicate user can set the 

time. Press      and      to select the digit (similar with cursor) of the time to be changed, 

press ▲ and ▼ to change the value of the selected digit of the time, then press “ENTER” 

to confirm and save the change or press “ESC” to cancel the change.

Press “TEST” to perform test, the LCD shows basic elements including battery power, 

high-voltage warning symbol, leakage current, real-time output voltage, measured 

insulation resistance, testing value of analog bar graph, Time1, set countdown time, 

storage capacity, etc.

When the set time is up, the test ends automatically, the testing indicator light turns 

off, and the tester automatically discharge fast (discharge course is displayed), the 

LCD maintains current measured element on it.

Note: Before removing the lithium battery pack, please power off the tester and 
remove all test leads to prevent electric shock!

9.3 Basic Measurement Operations

9.3.1 Insulation Resistance Measurement

Note:
      To perform wiring and measurement operations, please wear high-voltage 
      insulation gloves and protective gear before testing.
      Before testing, please make sure that the measured object is de-energized, 
      and do not measure the insulation of live equipment or circuit.
      Please operate the tester with care as high-voltage output exists. Please 
      ensure good contact between measured object and test lead. Keep your hands 
      away from the test clips before pressing “TEST” button to perform test.
      Do not short-circuit the two test leads during testing (high-voltage output state) 
      or measure insulation resistance after high-voltage output, otherwise it may 
      cause personal injury, fire or product damage.

Where R is the measured insulation, U is the tester output voltage and I is the 
current of measured circuit. 

R=

U

I

Calculation formula:                  (Ohm’s law)

Fig. 9.2.2 Charged with charging stand (optional: UT-W12)

UT512D/E User Manual

UT512D/E User Manual

For resistance below 1M

Ω

 at the 250V range, the measurement duration cannot 

exceed 10 seconds and multiple consecutive measurements cannot be performed. 
For resistance below 2M

Ω

 at the 500V range, below 5M

Ω

 at the 1000V range, 

and below 10M

Ω

 at the 2500V range , the same limitations apply.

Summary of Contents for UT512D

Page 1: ...UT512D UT512E 2 5kV Insulation Resistance Tester User Manual P N 110401111817X...

Page 2: ...Trend guarantees that the product is free from any defect in material and workmanship within one year from the purchase date This warranty does not apply to damages caused by accident negligence misu...

Page 3: ...ainly used to measure insulation resistance of cable motor power generator transformer mutual inductor high voltage switch lightning arrester and more it is an ideal measurement meter for electric pow...

Page 4: ...T512E 8 PCS LR14 alkaline batteries UT512D Error limit a of reading b digits one year warranty Environment temperature 23 5 Environment humidity 45 75 RH In the table below The humidity must be less t...

Page 5: ...ications UT512E Function Measurement range Accuracy Remark Low resistance measurement Open circuit voltage 5V Note If the measured resistance is 20 the buzzer alarms if 660 660 is displayed The short...

Page 6: ...bidden to use the tester without battery cover set in place otherwise it may pose a risk of electric shock Keep fingers behind the finger guard when perform measurement do not touch exposed wire conne...

Page 7: ...plug red lead GUARD Grounding protection outlet single plug green lead EARTH High resistance measurement outlet single plug black lead LCD segmented display screen Functional buttons USB port Carryin...

Page 8: ...testing Bluetooth Insulation resistance measurement mode AC DC voltage measurement mode Power on off Increase select high range or previous group of data Decrease adjust time and resistance cyclically...

Page 9: ...ress this button to switch to insulation resistance testing function V UT512E AC DC voltage testing button Without high voltage output short press V button to switch to AC DC voltage testing mode The...

Page 10: ...measurement Data deletion button In READ state short press CLR and then press ENTER to delete current data press ESC to exit data deletion function In READ state the symbol CLR and the storage capaci...

Page 11: ...rged if low battery occurs please replace with battery in same type 9 2 Battery Charging UT512E When charging with battery charger in power on state the battery power indicator and the charging symbol...

Page 12: ...hange Press TEST to perform test the LCD shows basic elements including battery power high voltage warning symbol leakage current real time output voltage measured insulation resistance testing value...

Page 13: ...tion resistance in Time1 9 3 1 4 Dielectric Absorption Ratio Measurement Dielectric Absorption Ratio DAR refers to the value of insulation resistance in 1 minute to that in 15 seconds It takes 1 minut...

Page 14: ...s if insulation resistance is less than comparison resistance the symbol FAIL will appear on the LCD otherwise PASS appears To return to the continuous measurement interface please press COMP in COMP...

Page 15: ...ltage input the danger symbol flashes in such case do not press the test button to measure resistance as shown in figure 9 3 4 2 Under resistance measurement function connect the black grounding lead...

Page 16: ...rminal with the exterior conductor of inner insulation layer and the unused cable Surface leakage current is conducted to the safety terminal so as to eliminate the surface leakage current at the meas...

Page 17: ...Red XI Maintenance Clean the casing 1 Wipe the surface using soft cloth or sponge dipped with water 2 Do not immerse the tester in water to avoid tester damage 3 Do not store the tester if it is wet 4...

Reviews: