OPERATING & CHECK OUT PROCEDURES.
-
30
15. Operating & Check-Out Procedures.
- Cont.
1.
2.
3.
4.
7.
TURNING THE SYSTEM OFF
CONGRATULATIONS!
BE SURE TO COMPLETE THE PRODUCT REGISTRATION INFORMATION ON THE BACK OF THE WARRANTY AND
REMIND YOUR CUSTOMER TO COMPLETE THE PRODUCT REGISTRATION AT UMASOLAR.COM.
Turn the pool pump off.
Turn the 3-way valve so the “closed” indicator points toward the solar feed side of the valve.
That’s all there is to it. You have installed an eco-SPARK solar pool heating system that has been tested and
proven world-wide for quality and reliability. If you run into any problems with your installation or have any
future problems, call your eco-SPARK representative.
If you have carefully followed the steps in this manual, you now have an efficient, professional looking
eco-SPARK solar pool heating system.
If isolating the collectors, close the 2-way valve on the feed line after you are sure all the water has drained out of
the collectors and plumbing.
Turn the pool pump on to filter the pool as needed.
During the cooler months of the year, it is essential that the pool surface be covered at night with a “pool blanket”
to maintain a comfortable water temperature. Low nighttime temperatures can lower the water temperature more
than the solar can recover during the day.
INSTALLATION MANUAL eco-SPARK™ SOLAR POOL HEATER
©
2015 UMA Solar