Issued/Revised:
25
FOOTING DETAIL - IN GROUND
2
1
3
4
2
5
1
CM
0
INCH
0
10
9
6
11
14
8
15
7
12
13
4
3
6
5
01/27/14
800.458.5872
www.ultraplay.com
UPRIGHT
INGROUND
FOOTER
3/8" HEX NUT
(33-01-0002)
3/8" FLAT WASHER
(33-02-0002)
3/8" x 1 1/4"
P.B.H.C.S. w/PATCH
(33-05-0019)
1. Attach Inground Footer to Upright Post using 3/8" x 1 1/4" P.B.H.C.S., 3/8" Flat Washer, and 3/8" Hex Nut. Refer to Footing Table
and Footing Layout page for Hole/Footer location. See Detail 069.
2. Continue assembling unit before pouring concrete. Refer to specific component installation instructions.
IMPORTANT: POURING
CONCRETE IS THE VERY LAST STEP!