Issued/Revised: 02/02/16
FOOTING DETAIL - IN-GROUND
800.458.5872
www.ultraplay.com
23
(02-08-0171)
Parts List Footing Package -for- SAPLING INGROUND (02-08-0171)
PART NUMBER
QTY
DESCRIPTION
ITEM
02-08-0139
8
FOOTBUCK ASSEMBLY
1
02-08-0162
4
FOOTBUCK
2
33-11-0003
16
M10 x 25mm (1") BHCS BOLT
3
33-11-0005
4
M10 x 35mm (1 3/8") BHCS BOLT
4
33-11-0400
20
M10 LOCK NUT
5
IMPORTANT:
Never install play equipment over hard, unresilient surfaces such as asphalt, concrete,
or compacted earth. It is the owner's responsibility to ensure the "minimum area required" contains an
appropriate amount of resilient material to cushion accidental falls.
SITE PREPARATION
Clear area of any debris and level surface. Equipment is designed to be installed on a level surface
013
1
UPRIGHT
POST
3
5
SURFACING
GROUND
CO
NCRET
E
PLACE BRICK OR EQUIVALENT
IN THE BOTTOM OF ALL
FOOTINGS TO PREVENT POST
FROM SINKING INTO THE GROUND
45° REF.
TYP.
PLATFORM MOUNTING
BRACKET
014
4
5
2
SURFACING
C
O
NCRE
TE
GROUND
12 in
[30.48 cm]
TYP.
SLIDE MOUNTING
BRACKET
4
5
017
2
SURFACING
CO
NCRE
TE
GROUND
12 in
Ø
Summary of Contents for DC-SAPR
Page 1: ...Issued Revised 02 02 16 DC SAPLING w ROOF 800 458 5872 www ultraplay com 1 MODEL DC SAPR...
Page 2: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 15: ...Issued Revised 02 02 16 TOOLS REQUIRED 800 458 5872 www ultraplay com 14...