Issued/Revised: 02/02/16
FOOTING DETAIL - ONGROUND
800.458.5872
www.ultraplay.com
21
(02-08-0170)
Parts List Footing Package -for- Sapling Onground (02-08-0170)
PART NUMBER
QTY
DESCRIPTION
ITEM
02-07-0048
24
GROUND SPIKE
1
02-08-0139
8
FOOTBUCK ASSEMBLY
2
02-08-0156
1
SLIDE ON-GROUND BRACKET
3
02-08-0161
3
PLATFORM ONGROUND BRACKET
4
33-11-0005
4
M10 x 35mm (1 3/8") BHCS BOLT
5
33-11-0010
16
M10 x 50mm (2") BHCS BOLT
6
33-11-0400
4
M10 LOCK NUT
7
33-11-0402
16
M10 T-NUT
8
IMPORTANT:
Never install play equipment over hard, unresilient surfaces such as asphalt, concrete,
or compacted earth. It is the owner's responsibility to ensure the "minimum area required" contains an
appropriate amount of resilient material to cushion accidental falls.
SITE PREPARATION
Clear area of any debris and level surface. Equipment is designed to be installed on a level surface
GROUND
SURFACING
1
2
008
009
GROUND
SURFACING
UPRIGHT
POST
4
1
PLATFORM MOUNTING
BRACKET
008
010
6
8
5
7
SURFACING
GROUND
SLIDE MOUNTING
BRACKET
1
008
016
3
5
7
SURFACING
GROUND
PLAY RAMP MOUNTING
BRACKET
1
4
5
7
008
084
Summary of Contents for DC-SAPR
Page 1: ...Issued Revised 02 02 16 DC SAPLING w ROOF 800 458 5872 www ultraplay com 1 MODEL DC SAPR...
Page 2: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 15: ...Issued Revised 02 02 16 TOOLS REQUIRED 800 458 5872 www ultraplay com 14...