7.3 Cable management system
Cable management fixings are located on each side of the mattress underneath the flap of the cover.
The mains power cable should be secured through the cable management fixing as follows:
Locate each cable management fixing.
If necessary, open the press studs.
Run the mains power cable along the side of the mattress securing each fixing loop around
the cable using the press studs
.
7.4 Connecting mattress to the power unit
Remove the cover of the air pipe connector and connect the air pipe
connector to the power unit and then ensure that the air tubes are free
from any kind of obstruction, and are not kinked.
Plug the power cable into a suitable electrical
socket and switch ‘ON’
using mains power switch found at the side of the power unit. All
indicators on control panel will light up.
The power unit will start Inflation (inflation mode) and the
Normal
Pressure
indicator will flash. Turn the comfort control to the maximum.
Once the mattress is fully inflated, you can then set to the appropriate
setting suitable for the patient
Caution: The power unit must only be connected to the mattress recommended by
the manufacturer. Do not use it for any other purpose.
Note: Ensure that the CPR tag is replaced in position over the CPR plugs.
Summary of Contents for Tamora Plus II
Page 2: ...Page 2 of 24 Issue 5 13 02 2019...
Page 18: ...Page 18 of 24 Issue 5 13 02 2019 16 EMC Information...
Page 19: ...Page 19 of 24 Issue 5 13 02 2019...
Page 20: ...Page 20 of 24 Issue 5 13 02 2019...
Page 21: ...Page 21 of 24 Issue 5 13 02 2019...
Page 22: ...Page 22 of 24 Issue 5 13 02 2019 Notes...