13
10. Remove the tension coil spring of the tape press-down section, remove the cap bolts provided
on the tape holder (1), and install a new tape holder (1)
Cap bolt M4 x 8
Spring washer 4
Stainless spacer CU-406
Pan-head screw
M4x16 Nut M4
11. While opening the tape guide by hand, install the tape press-down section.
12. While opening the tape guide by hand, install the heater section
13. Turn the power switch on and set the main spindle to the initial position.