9
U.S.SAWS has designed the 9” solid extension with a few degrees of movement to aid in a quick and easy set up.
However, exceeding the normal amount of alignment variables causes binding and stress that can damage the
extension and interlocking components.
•
Platform should be flat on the ground and legs should be shoulder
width apart.
• Drill and drive shaft should be in a level line perpendicular to the
ground.
• Be sure to lock the sliding collar to prevent slippage.
Tip:
Before inserting 9” solid extension down into the drive shaft set the
tool up just to the side of the valve box, this way you can see if any of
the alignment variable are out of place.
In cases of uneven or downhill slopes, approach exercising from the downhill side.
This allows the operator a safer standing position and makes it easier to set the tool for operation.
Do not lean the unit forwards or backwards against the drive shaft. Improper alignment will cause binding and stress
internal components of the gearbox. Evidence of such damage is considered misuse and will void the warranty.
Aligned
Misaligned
5.13
Power Head Breakdown
OPERATION
Waterworks
Division
P: 866 987-7297 F: 813-621-7125
Visit us at www.ussaws.com