USER GUIDE
u-line.com
General Installation
Connecting External CO
2
Source
Note: Connection to an external CO2 source
requires drilling a hole through the pre-installed
bulkhead located near the top of the back wall. It
is crucial to proper operation of the refrigerator
that air tight insulation is installed around the
incoming CO2 hose.
Prepare bulkhead and back panel
1. Inside the cabinet, drill out 1 of the holes in the bulk-
head
2. Insert insulation, such as a grommet, into drilled-out
hole. It may be necessary to apply food grade lubricant
to the inside of the grommet.
3. In the back of the unit, remove back panel.
4. Insert insulation, such as a grommet, into drilled-out
hole. It may be necessary to apply food grade lubricant
to the inside of the grommet.
BULKHEAD
5. Inside cabinet push CO
2
hose through drilled-out hole.
6. Re-install back panel.
7. Continue with inside connections (see CONNECTING
KEGS TO TOWER in this manual)
Connects to
external CO
Outside
Inside
17