background image

02/2005

7

www.U-LineService.com

SP18 Ice Maker

Checking Door Alignment

The unit’s door is aligned at the factory before shipment. 
However, its alignment could have been disturbed during 
shipment.

IMPORTANT

Properly aligned, the door’s gasket should be firmly in 
contact with the cabinet all the way around the door (no 
gaps).

1. Carefully examine the door’s gasket to assure that it is 

firmly in contact with the cabinet.

Note: 

When inspecting door alignment, make sure the 

door gasket is not pinched on the hinge side of the door

.

2. If the door is properly aligned, go on to 

5 Prepare 

Plumbing

. If it is not, use the following procedure.

Adjusting Door Alignment

1. Loosen (do not remove) 

top and bottom hinge 
screws. See 

Figure 14

.

2. Align door squarely with 

cabinet. Make sure gasket 
is firmly in contact with 
cabinet all the way around 
the door (no gaps).

3. Tighten bottom hinge 

screws.

4. Tighten top hinge screws. 

Go on to 

5 Prepare 

Plumbing

.

CAUTION

Plumbing installation must observe all state and local 
codes. All water connections MUST BE made by a licensed/
qualified plumbing contractor. Failure to follow 
recommendations and instructions may result in damage 
and/or harm.

WARNING

To prevent accidental electrocution, make certain 
that the floor surfaces surrounding the unit are 
dry whenever power is removed from, or applied 
to, the unit.

Water Supply Connection

Note: 

Water temperature from source will affect ice 

production. U-Line recommends room temperature or 
colder water be used.

When connecting the water supply, follow these 
guidelines:

• Review any applicable plumbing codes before you 

install the unit.

• Connect to the cold water supply.

• The water pressure should be between 20 and 120 psi.

• Install a shut-off valve in the 1/4 inch OD water supply 

line.

• Connect sufficient tubing to the unit so that tubing 

may be looped, allowing the unit to be removed for 
cleaning and servicing (see 

Figure 17

). However, make 

certain that the tubing is not pinched or damaged 
during installation.

• U-Line recommends the use of copper tubing for 

installation.

To connect to water supply:

1. Install the 1/4 inch OD copper water line from the 

main water source.

4 Adjust Door

Figure 14

5 Prepare Plumbing

Summary of Contents for Origins SP18

Page 1: ...one 414 354 0300 FAX 414 354 7905 Service Parts Tech Lines Phone 800 779 2547 FAX 414 354 5696 OnlineService U Line com 2005 U Line Corporation 02 2005 SP18 Ice Maker for Marine or Recreational Vehicl...

Page 2: ...antial property damage If you are unsure of your ability to safely connect the water supply to the unit consult a licensed plumber for assistance This unit requires connection to a grounded three pron...

Page 3: ...unction You have received a carton containing your SP18 Ice Maker with a package inside containing a User Manual a Product Registration Card and water connection parts Complete and mail the Product Re...

Page 4: ...nter depth in most installations 26 5 16 depth includes the door handle and water line connection see Figure 2 IMPORTANT It is extremely important that the unit sits on a level surface as it does not...

Page 5: ...ews on either side 5 Install hinge on opposite side bottom of cabinet See Figure 8 Replace nut on back side where installed Align hinge outer edge with cabinet before tightening screws 6 Relocate plas...

Page 6: ...el pin in door engages the closer in the assembly then tighten screws on travel pin assembly securely See Figure 13 Other Site Requirements Power Supply The unit requires a grounded and polarized 110...

Page 7: ...local codes All water connections MUST BE made by a licensed qualified plumbing contractor Failure to follow recommendations and instructions may result in damage and or harm WARNING To prevent accide...

Page 8: ...17 This will also safeguard against kinking the line 5 Go on to 6 Prepare Power Supply Electrical Specifications CAUTION Electrical installation must observe all state and local codes This unit requi...

Page 9: ...osition Be careful not to kink the water supply line or entangle the electrical cord 4 Re check the leveling from front to back and side to side Make any necessary adjustments 5 Secure the flange to t...

Page 10: ...n temperature for ice storage IMPORTANT It is possible that dirt or scale will dislodge in the water line Always throw away all ice cubes made during the first twenty four 24 hours of operation Start...

Page 11: ...es U Line has distinguished itself as the leader in built in undercounter ice making refrigeration and wine storage appliances Who to Call Service Information If the need for service arises contact th...

Reviews: