CLR2060 — Clear Ice Maker
02/2005
13
www.U-LineService.com
™
If using a Gravity Drain:
1. Attach the 5/8-inch ID drain connection on the back of
the unit to a 5/8-inch OD rigid tube, using a worm
clamp.
2. Attach the other end of the rigid tube to your 5/8-inch
ID drain line with a worm clamp.
3. Insulate the drain line, if necessary to prevent
condensation. Go on to
Water Supply Connection
.
Factory-Installed Drain Pump
If your drain line will run up to a stand pipe, disposal
assembly or spigot assembly or does not otherwise meet
the requirements for a Gravity Drain, you may have
ordered the CLR2060 with a U-Line P60 Drain Pump. See
Figures
32
,
33
and
34
for typical installations requiring a
Drain Pump. If you need to install a P60 Drain Pump into
your unit, see
Locally-Installed Drain Pump
on
Page
14
.
IMPORTANT
Before installing your U-Line CLR2060 with Factory-
Installed U-Line P60 Pump, it is extremely important to
check and test all hose connections at the drain pump.
There is a possibility that hose connections may have
loosened during shipment.
WARNING
To prevent accidental electrocution, make certain
that the floor surfaces surrounding the unit are
dry whenever power is removed from, or applied
to, the unit.
Waste
Waste
Cold
Water
Shut-Off
Valve
Hot
Water
Figure 31
Gravity Drain
Waste
Cold
Water
Hot
Water
Waste
Shut-Off
Valve
Figure 32
Stand Pipe
Cold
Water
Hot
Water
Waste
Air Gap
(Optional Hook-Up)
Shut-Off
Valve
Figure 33
Disposal Assembly
Waste
Cold
Water
Shut-Off
Valve
Hot
Water
Air Gap
(Optional Hook-Up)
Figure 34
Spigot Assembly