2
Qwik Install
STEP 1:
Add Grounding Wire Between Door and Enclosure: Remove
plastic covers on copper studs
on inside of door and inside of
enclosure. Add jumper wire be-
tween 2 copper studs and use
copper washers and nuts to se-
cure.
STEP 2:
Add wire feedthrus and
any necessary connectors into
the bottom connector plate. Plug any unused holes with hole plugs pro-
vided. Attach the connector plate to the bottom of the enclosure using
self tapping screws provided.
STEP 3:
Install hole plug in drain hole in bottom right corner of the en-
closure.
STEP 4:
Mount any equipment to the orange backplate and secure the
backplate in the enclosure. Equipment can also be mounted to the in-
side of door if more room is required.
STEP 5:
Insert the battery platform in the bottom of the enclosure. The
battery platform has cutouts so wires can be routed under the battery
as needed.
STEP 6:
Connect Bat-
tery Cable to Controller.
Be sure to observe prop-
er connection polarity.
STEP 7:
If pole mount-
ing the enclosure, as-
semble the pole mount kit to the back of the enclosure and mount the
enclosure to a pole using the 6 hose clamps provided. The enclosure
can also be wall mounted using the 4 holes in the back of the enclo-
sure.
STEP 8:
Assemble the solar panel mount and set the correct tilt angle
based on your Latitude. There is a useful tool to calculate optimum an-
gle at tyconsystems.com If you will be using a fixed angle all year we