PCN 504819-000
Effective Date: June 29, 2010
PII 54863
Revision AD
11
1 wrap
Red Sealant
1 wrap
Red Sealant
693a
40. Apply sealant
Apply one wrap of black sealant starting at the jacket cutbacks
around both cable jackets as shown.
Retention Clip
Black / Green Wraparound Sleeve
2578
41. Position wraparound sleeve
Remove or tape over all sharp points to prevent puncture of
wraparound sleeve. Remove backing from wraparound sealing
sleeve and center sleeve over splice. Slide metal retention clip onto
the butted rails.
PILC
P
OL
Y
Tape Wrap
Clean Jacket
(200mm)
8"
Clean Jacket
(200mm)
8"
693
39. Install armorwrap
Position armorwrap around splice area and center on the exposed
cable armor and lead sheath.
Bind the ends of the armorwrap to the cable armor and lead sheath
with the tape provided.
Abrade and solvent clean cable jackets as shown to provide an oil-
free, clean surface.
1/4"
(5mm)
min.
1/4"
(5mm)
min.
Retention
Clip
Channels slide over
retention clip
686
42. Install channel clip
Connect the channels by overlapping the retention clip as shown at
right.
Note:
Channels must overlap sleeve edge by 1/4 inch (5mm)
minimum.
If channels slide on easily go to step 43. If channel fit seems tight,
continue with next paragraph.
As shown in illustration A, make sure flap is not pinched between
the rails. Push the sleeve up from the bottom and down from the
top while sliding on channel as shown in illustration B. The idea is to
flatten the rails together to prevent the channels from binding.