background image

I

STANDARDIZATION

WORKHOLDING SYSTEMS

MT

S 2

.0

ER-096901

MTS 2.0
IntegralChuck M-P/A

Inhalt:

1. Verpackungsinhalt 

überprüfen 

................................................................................................................................................. 001

2. Wichtige 

Hinweise 

..................................................................................................................................................................... 004

3. Technische 

Daten 

...................................................................................................................................................................... 005

4. Inbetriebnahme 

.......................................................................................................................................................................... 007

5. Einbaubohrungen 

...................................................................................................................................................................... 008

6. 

Montage der Spannfutter .......................................................................................................................................................... 013

7. Montagebeispiel 

......................................................................................................................................................................... 015

8. 

Ansteuerung mit der EROWA Steureinheit ER-136200 (Option) ........................................................................................... 016

9. 

Anwendung schwerer Palettenwechsel .................................................................................................................................. 017

10. Anwendung 

................................................................................................................................................................................ 019

11. Instandhaltung, 

Wartung........................................................................................................................................................... 020

12. 

MTS Spannfutter aus Basisplatte ausbauen ........................................................................................................................... 023

13. Störungen, 

Fehlerbehebungen 

................................................................................................................................................. 024

14. Optionen 

..................................................................................................................................................................................... 025

15. Ersatzteile 

................................................................................................................................................................................... 025

16. Technischer 

Support 

................................................................................................................................................................. 025

MTS 2.0
IntegralChuck M-P/A

Contents:

1. 

Check package  contents .......................................................................................................................................................... 001

2. Important 

notices 

....................................................................................................................................................................... 004

3. Technical 

data 

............................................................................................................................................................................ 005

4. Setting 

up 

................................................................................................................................................................................... 007

5. Fitting 

boreholes 

........................................................................................................................................................................ 008

6. 

Mounting the chucks ................................................................................................................................................................. 013

7. Example 

mounting 

..................................................................................................................................................................... 015

8. 

Control using the EROWA control unit ER-136200 (option) .................................................................................................. 016

9. 

Changing heavy pallets ............................................................................................................................................................. 017

10. Application 

................................................................................................................................................................................. 019

11. Maintenance 

............................................................................................................................................................................... 020

12. 

Removing MTS chuck from base plate .................................................................................................................................... 023

13. 

Failures: cause and action ........................................................................................................................................................ 024

14. Options 

....................................................................................................................................................................................... 025

15. Spare 

parts 

................................................................................................................................................................................. 025

16. Technical 

support 

...................................................................................................................................................................... 025

DOC-104183-04

MTS 2.0
IntegralChuck M-P/A

Table des matières:

1. 

Vérifier l'intégralité de la livraison ........................................................................................................................................... 001

2. Informations 

importantes 

......................................................................................................................................................... 004

3. Caractéristiques 

techniques 

..................................................................................................................................................... 005

4. 

Mise en service  ......................................................................................................................................................................... 007

5. 

Trou de montage ........................................................................................................................................................................ 008

6. 

Installation des mandrins ......................................................................................................................................................... 013

7. Montage 

exemplaire 

.................................................................................................................................................................. 015

8. 

Commande avec unité de commande EROWA ER-136200 (option) ..................................................................................... 016

9. 

Utilisation de transfert de palettes lourdes ............................................................................................................................. 017

10. Application 

................................................................................................................................................................................. 019

11. Maintenance 

 

.............................................................................................................................................................................. 020

12. 

Démonter le mandrin MTS de la plaque de base .................................................................................................................... 023

13. Pannes, 

dépannage 

................................................................................................................................................................... 024

14. Options 

....................................................................................................................................................................................... 025

15. 

Pièces de rechange ................................................................................................................................................................... 025

16. Assistance 

technique 

................................................................................................................................................................ 025

Summary of Contents for ER-096901

Page 1: ...tting boreholes 008 6 Mounting the chucks 013 7 Example mounting 015 8 Control using the EROWA control unit ER 136200 option 016 9 Changing heavy pallets 017 10 Application 019 11 Maintenance 020 12 Removing MTS chuck from base plate 023 13 Failures cause and action 024 14 Options 025 15 Spare parts 025 16 Technical support 025 DOC 104183 04 MTS 2 0 IntegralChuck M P A Table des matières 1 Vérifie...

Page 2: ...II STANDARDIZATION WORKHOLDING SYSTEMS ER 096901 DOC 104183 04 ...

Page 3: ...2 Z supports with boreholes for cleaning monitoring 3 Boreholes for attachment bolts 12 x 4 Note read manual 5 Dowel pin for anti rotation device 6 MTS Locking bolt 7 Serial Number P4 Reclamp position P6 Position open check EROWA chucks are used to hold workpiece carriers and work piece clamping systems 1x Dowel pin m6 ø 6 x 16 DOC 104183 04 Sécurité garantie responsabi lités et adresses de servic...

Page 4: ...red according to the generally recog nized rules of technology and the state of the art of science and technology Even so machines involve risks which cannot be avoided by means of design and con struction In order to provide personnel working with the EROWA Product with ad equate safety additional precautions are provided Adequate safety at work with the EROWA Product can only be ensured if these...

Page 5: ...erat ing instructions machine tool NOTICE The operating company is re sponsible for the selection and verification of use of the individ ual protection equipment Protection devices Personal protective equipment WARNING Be sure to observe the maxi mum cleaning pressure Avoid excessive blowing and noise with compressed air wear hearing protection To avoid eye injuries wear properly fitting safety gl...

Page 6: ...nical adaptions such as additional holes or re grind ing surfaces are allowed on any MTS chucks Never attempt to insert other springs or O rings than specified 2 Important notices NOTICE Do not use any masses or pastes containing solid lubri cants They may cause the chucking spigot to be stuck in the centering taper 8 DOC 104183 04 AVERTISSEMENT Ne jamais tenter de démonter un mandrin MTS sans avo...

Page 7: ...O rings on the chuck ing spigot could be pushed away when inserting a pallet This would damage the O rings when placed upon and the presence check would no longer function properly Automatable Yes Monitoring Open check P6 pallet present P3 Quality of compressed air class 4 We recommend to feed the air supply through a unit with oil and waterseparator Operating temperature Clamped by depressurizati...

Page 8: ... ø4 for com pressed air supply thread for pneumatic connection The reclamping pressure must not exceed 6 bar IMPORTANT P6 Open check Borehole ø5 ø4 for com pressed air supply thread for pneumatic connection Supply pressure DOC 104183 04 P4 Resserrage Perçage de ø5 ø4 pour arrivée d air comprimé fi letage pour circuit pneuma tique raccordement La pression de resserrage ne doit pas excéder 6 bars IM...

Page 9: ...ved once the MTS Chuck has been fitted to a machine table clamping fixture etc The MTS Chuck is under spring pressure The MTS chuck is fitted to the surface so that it rests on its cover 1 Version A1 The MTS Chuck is sunk into the surface IMPORTANT Version B1 only recommended for special applications Fitting diagram on request Application To be fitted to milling machines machining centers EDM ma c...

Page 10: ...struc tions of this manual If MTS chuck are mounted in to non corrosion resistant material machine table plates etc the mounting holes may rust The seals of the chuck may be dam aged The chuck will no longer open or close EROWA LTD will not be held responsible for any defects on MTS chucks or other dam age related thereto in case the above requirements are not strictly met Prepare fitting surface ...

Page 11: ...re that you are with in a position tolerance of 0 01 NOTICE NOTICE Version A1 The following fitting diagram serves as a description of Version A1 NOTICE Also ensure that downward 9 or lateral 10 air drainage is guaranteed The vent to the side may also be implemented as a bore hole with an air drain bolt see page 12 Air drainage 3mm deep 34 mm wide with 2x 45 chamfer DOC 104183 04 Mandrin MTS posé ...

Page 12: ...he ø 121 pitch circle Cleaning monitoring P3 Borehole ø 5 ø 3 for com pressed air supply thread for pneumatic connection Make sure that the connection borehole ø 3 tallies with the po sition of borehole 12 so that compressed air supply will be guaranteed NOTICE Dowel pin borehole for Dowel pin anti rotation de vice DOC 104183 04 Perçage de raccordement ø 3 pour nettoyage et surveillance Peut être ...

Page 13: ...4 for compressed air supply thread for pneumatic connection Connection borehole ø 3 for opening Can be drilled at any location on the ø 65 pitch circle Open close Borehole ø 5 ø 3 for com pressed air supply thread for pneumatic connection Positions of mounting thread M6 12x for chuck Dowel pin borehole DOC 104183 04 Resserrage P4 Perçage de ø5 ø4 pour arrivée d air comprimé filetage pour cir cuit ...

Page 14: ... depth of the borehole should be 36 mm EROWA recommendation Drill through hole NOTICE Drilling a through hole ø31 H7 is preferable If this hole cannot be drilled through the exhaust air is to be drained through a separate hole ø 5 10 to the side An M6 airdrain bolt option ER 060131 set of 4 units can be fitted into borehole 10 for protection against chips and splashing water IMPORTANT DOC 104183 0...

Page 15: ...0g tube ER 019342 Ensure that the contact surfaces 16 17 are free of any grease Diagram C Insert MTS chuck by hand However make sure in advance that the supplied dowel pin 5 is inserted in the base plate If the base plate does not have a dow el pin hole make sure that the P4 and P6 holes of the chucks and base plate are on top of each other Diagram D 6 Mounting the chucks DOC 104183 04 Nettoyer le...

Page 16: ...d carry out a func tion check Then fit the sealing caps of the 12 socket head bolts IMPORTANT The MTS chuck must not catch an edge on insertion Do not use any tools Ensure that the O ring and the mounting surface do not get damaged Diagram E NOTICE O Rings Screw in the M6 socket head bolts 18 12x and tighten to 16 Nm DOC 104183 04 Raccorder l unité de commande ER 136200 puis contrôler le bon fonct...

Page 17: ...ten bolts 19 Diagram I Choose centering taper 8 as the datum point Diagram J Take care not to damage any of the existing air supply boreholes with the fixing boreholes NOTICE Insert bolts 19 not supplied but do not tighten yet Diagram H Thoroughly clean the contact surfaces of both the plate and the machine table Place plate on desired surface Example MTS 2 0 Baseplate 200x360 P A 7 Example mounti...

Page 18: ...ion for the control unit ER 136200 is de scribed in its operating manual IN 1 Compressed air for the following functions Opening Reclamping Open check IN 2 Compressed air for the following function Cleaning P2 Opening the chuck P3 Cleaning the chuck P4 Reclamping the chuck P6 Open check D1 Throttle for setting compressed air cleaning D2 Throttle for barrier air overpressure Sig Signal output for c...

Page 19: ... 25 befestigt Danach kann die Palette sicher eingesetzt werden Beschädigungen am Spannfut ter 26 oder an den Spannzap fen 23 werden somit verhin dert Beim Wechseln von grossen schweren Paletten mit Decken kran oder EROWA Lift empfeh len wir mit Vorzentrierung zu arbeiten IMPORTANT When moving heavy pallets and workpiece carriers we recom mend using the EROWA de vices specially designed for this pu...

Page 20: ...TICE While changing a pallet is must not be tilted more than 0 5 Otherwise the chucks or the spigots may be damaged Tolerance during pallet change NOTICE For more specific techni cal questions please contact EROWA DOC 104183 04 INDICATION Pendant le changement d une palette l inclination ne peut pas surpasser 0 5 Sinon c est possible d endom mager les mandrins ou les tiges de préhension Tolérance ...

Page 21: ...fore not be immersed in liquid without a pal let nor must they be activated opened closed when they are immersed Every MTS chuck that is not used must be sealed with a seal ing pallet ER 070064 If MTS chucks are submerged fluid may penetrate from above and below The casing may be flooded through the boreholes cleaning boreholes The functionality of the chuck is no longer ensured Application of the...

Page 22: ...assed a full maintenance of the MTS chucks is necessary It will take place at EROWA or may be carried out by especially trained staff Quo tations shall be prepared by the respective sales agency Time past since previous maintenance The maintenance intervals must be adhered to in order to ensure safe clamping NOTICE The yearly check may be ex ecuted by the EROWA customer service NOTICE Checking the...

Page 23: ...must be performed The chuck 26 and chucking spigots 23 must be cleaned weekly In particular all Z supports 2 the balls 27 and the centering taper 8 must be cleaned thoroughly with a cloth The chuck must be open and the cleaning air must be turned on Hold your hand flat over each blow off borehole 29 of the chuck and check the air flow If any boreholes have been clogged during cleaning they must be...

Page 24: ...ngs on the chucking spigot must be inspected for damage and must be replaced if necessary All chucking spigots 23 must be checked for mechanical damage visual inspection for cracks dents etc and must be replaced if necessary For the correct fitting of the spigots refer to the instruction manual for centering and chuck ing spigots IMPORTANT DOC 104183 04 Contrôle des tiges de préhension Contrôler q...

Page 25: ...n disman tled and reassembled by a cus tomer on its own CAUTION The Locking bolt 6 may only be removed once the MTS Chuck has been fitted to a machine table clamping fixture etc The MTS Chuck is under spring pressure 12 Removing MTS chuck from base plate 1 Open chuck 2 Insert locking bolts 3 Lock chuck 4 Check if bolt sits correctly 5 Remove bold caps 6 Remove all 12 fixing bolts 7 Lift chuck from...

Page 26: ...wo MTS Chucks must be fitted with reference to each other F Repeatability not right F Chucks cannot be opened C1 Supply pressure too low A1 Increase supply pressure to min 6 bar with the help of a pressure booster op tion C2 Air simultaneously supplied to P2 P4 A2 Close air supply to P4 A3 Drain air from P4 F failure C possible cause A action IMPORTANT For the correct fitting of the spigots refer ...

Page 27: ...ER 064499 Fast coupling ER 002675 Plug ø 6 ER 002673 Plug ø 4 ER 067563 Rubber seal MTS ER 070064 MTS Sealing pallet ø136 A ER 019342 Grease Staburags NBU 12 Tube of 50 grammes ER 037967 MTS locking bolt 15 Spare parts ER 108204 MTS 2 0 repair set pneumatic ER 060131 MTS air drain bolt set of 4 pieces IMPORTANT Find more products in our gen eral catalog or on our website www erowa com DOC 104183 0...

Page 28: ...ry or damage to materials Only lift the base plate by using the pro vided carrying latches 1 with a crane hoist IMPORTANT When moving heavy pallets and work piece carriers we recommend using the EROWA devices specially designed for this purpose For more information please contact your EROWA consultant WARNING DOC 054167 01 Risque de lésion Lors du levage et du transport la plaque de base peut tomb...

Page 29: ...2 STANDARDIZATION WORKHOLDING SYSTEMS DOC 054167 01 ...

Page 30: ... the information in the re spective operating instructions Please observe the drawings contained therein Make sure that the mounting hole of customer specific base plates machine tables etc does not corrode use of suit able material compressed air quality maintenance EROWA AG will not be held responsible for any defects on MTS chucks or other damage related thereto in case the above requirements a...

Page 31: ...2 STANDARDIZATION WORKHOLDING SYSTEMS DOC 081006 03 ...

Page 32: ...n 17 Mai 2006 einschliesslich späterer Änderungen der Richtlinien EC declaration of incorporation The manufacturer hereby declares that the product is in compliance with the following provi sions DIRECTIVE 2006 42 EC ANNEX II B Machinery 17 May 2006 including later amendments to the directives Directives DOC 130085 00 Déclaration CE d incorporation Le fabricant déclare par la présente que le produ...

Page 33: ...when it has been connected put into operation and tested for proper function in accordance with the operating instructions NOTICE Standards Authorized person to compile the relevant technical documentation according to direc tive 2006 42 EC ANNEX VII Part B Walter Venturi EROWA AG Büron The Management System of EROWA AG has been certified by Swiss TS according to ISO 9001 2015 and registered under...

Page 34: ...at they are subject to extensive quality checks both during production and on the end product Guarantee is valid for 12 months from the date of purchase It is limited to the re placement of faulty parts Further reach ing claims are precluded The products of EROWA AG must be in stalled and operated in strict accordance with the conditions laid down in this doc umentation Only EROWA AG original part...

Page 35: ... Spain EROWA Technology Ibérica S L c Via Trajana 50 56 Nave 18 E 08020 Barcelona Spain Tel 093 265 51 77 Fax 093 244 03 14 erowa iberica info erowa com www erowa com Italy EROWA Tecnologie S r l Sede Legale e Amministrativa 8KC NƂGTK CUGTCVK IT 10095 Grugliasco TO Italy Tel 011 9664873 Fax 011 9664875 info erowa it www erowa com Unità di Treviso Via Leonardo Da Vinci 8 IT 31020 Villorba TV Italy ...

Reviews: