
E-3
4. Locate Hearth/Base (A) and set out f nished
side up on the f oor.
5. Insert one Wood Dowel (N) into each of the
pre-drilled holes.
6. Attach the Completed assembly from step 3 to
the Hearth/Base (A). Make sure that dowels
are seated into the pre-drilled holes in the
Hearth/Base. Using Bolts (L) and Washers (M)
attach panels through pre-drilled holes in the
mounting blocks.
HAND TIGHTEN ONLY.
7. Insert one Wood Dowel (N) into each of
pre-drilled holes. Push the Right Side Panel (F)
and Left Side Panel (E) snug to completed
assembly from step 6. Using Bolts (L) and
Washers (M) through the pre-drilled holes in
the mounting blocks.
HAND TIGHTEN ONLY.
Left
Side
Panel
Right
Side
Panel
L
L
N N
A
N
N
M
M
E
F
8. Insert one Wood Dowel(N) into each of the
pre-drilled holes on the top edges of the
Assembly from step 7. Then locate
Mantel/Top (G) and lay f nished side up on
top of completed assembly. From the inside,
attach Mantel/Top (G) using Bolts (L) and
Washers (M) through the pre-drilled holes in
the mounting blocks.
HAND
TIGHTEN
ONLY.
9. Using Phillips head screwdriver tighten all
Bolts alternating top and bottom, left and
right.
N
N
N N
N N
N N
L
M
Mantel/Top
G