background image

LIQUID PROPANE GAS CONNECTION-BUILT IN APPLICTION 

 
Notice 

All gas installations, conversions, and/or adjustments must be performed by an authorized 
service agent. 

 

Notice 

If your Infrared Sear Station is for built-in application, a factory supplied L.P regulator is set for 
11” WC and is for use with L.P. gas only.  The factory-supplied regulator and hose must be 
used with a 20 lb. L.P. cylinder.  For plumb-in installation (system L.P. installation), the regulator 
must be changed and a main gas shutoff valve must be installed.   Contact your Twin Eagles 
dealer for a system L.P. regulator. 
 

Warning

  

The gas supply hose should be inspected prior to each use.  Do not use a gas hose that has 
abrasions, cuts, or excessive wear. 
 
The gas supply must be turned off at the LP Gas supply cylinder and the LP Gas supply cylinder 
must be disconnected from the regulator when this outdoor cooking gas appliance is not in use. 
 
When your Infrared Sear Station is stored indoors, remove and store the LP Gas cylinder 
outdoors in a protected, cool, and dry location out of reach of children.  The cylinder should not 
be stored in a building, garage, or any other enclosed area. 

 

Caution 

Store the cylinder in an upright position so that the cylinder valve is at the top.  This will ensure 
proper vapor withdrawal. 
 
The cylinder used must include a collar to protect the cylinder valve. 
 
Store any spare or extra gas cylinder(s) at least 15 feet from the Infrared Sear Station, other 
open flame, heat-producing appliance(s) or heat source in a cool, well-ventilated outdoor 
location.   
 
NOTE: An enclosure for a propane gas cylinder shall be vented by openings on the level of the 
cylinder valve and at floor level.  The effectiveness of the opening(s) for purposes of ventilation 
shall be determined with the propane gas supply cylinder in place.  This shall be accomplished 
by one of the following: 
 

a.  One side of the enclosure shall be completely open; or, 
b.  For an enclosure having four sides, a top and a bottom: 

1.  At least two ventilation openings at cylinder valve level shall be provided in 

the sidewall, equally sized, spaced at 180 degrees (3.14 rad), and 
unobstructed.  Each opening shall have a total free area of not less than ½ 
square inch per pound (7.1cm²/kg) of stored fuel capacity and not less than a 
total free area of 10 square inches (64 cm²). 

2.  Ventilation opening(s) shall be provided at floor level and shall have total free 

area of not less than ½ square inch per pound (7.1 cm²/kg) of stored fuel 

 

7

Summary of Contents for TPSS-13

Page 1: ... TWIN EAGLES INC Defining the Art of Outdoor Cooking TWIN EAGLES INFRARED SEAR STATION USE CARE MANUAL Models TPSS 13 TPSS 13F Part No 18532 08 04 ...

Page 2: ... Liquid Propane Gas Connection Built In Application 7 o Procedure for LP Cylinder Connection 20lbs 8 Free Standing Application 9 Operating Instructions 10 11 Gas Leak Test 10 Lighting Instructions 10 Manual Lighting Instructions 10 Replacing the Battery 10 Extinguishing the Burner Flame 10 Burner Flame 11 Cleaning and Maintenance 11 12 General Overview 11 Grease Tray 11 Cooking Grates 11 Spider an...

Page 3: ... is not intended for commercial use The use of alcohol prescription or non prescription drugs may impair your ability to properly assemble or safely operate this appliance General Safety Requirements 1 In the U S installation of this appliance must conform to local codes or in the absence of local codes the National Fuel Gas Code ANSI Z223 1 latest edition In Canada operation of this product shoul...

Page 4: ...odel and serial number Your new Infrared Sear Station model and serial number are included on the data rating plate located behind the control panel Complete Warranty Information Below Please record the following information and refer to this information when contacting the company or an authorized service agent This information is found on the data rating plate In addition keep the original invoi...

Page 5: ...nstalled in or on recreational vehicles and or boats This appliance must be on a level stable surface in an area clear of combustible material An asphalt surface may not be acceptable for this purpose Location of Infrared Searing Station Proper location and use is essential to ensure safe and continued trouble free operation Any alterations made to the appliance will void the product s warranty Th...

Page 6: ...s Infrared Sear Station is ETL approved for residential installation Cutout must include a 4 10 2cm x 4 10 2cm opening for a rear or bottom gas connection in the center of the cutout as indicated by the square cut outs in the diagram above All dimensions shown are for planning purposes only Twin Eagles reserves the right to change specification without notice 5 ...

Page 7: ...re testing of the gas supply piping system at test pressures equal to or less than 1 2 psi A typical natural gas installation is shown above Make sure the factory supplied regulator is used and installed with the arrow mark on the regulator pointing in the same direction as the gas flow going from the supply line to the Infrared Sear Station The regulator is preinstalled onto the gas line and secu...

Page 8: ...her enclosed area Caution Store the cylinder in an upright position so that the cylinder valve is at the top This will ensure proper vapor withdrawal The cylinder used must include a collar to protect the cylinder valve Store any spare or extra gas cylinder s at least 15 feet from the Infrared Sear Station other open flame heat producing appliance s or heat source in a cool well ventilated outdoor...

Page 9: ...d Wheel on cylinder clockwise until it stops to ensure the Cylinder Valve is fully closed 2 Turn the burner knob to the OFF position 3 Connect the NPT x Flare brass coupling coupling not supplied with product to the end of the gas line on the product 4 Connect the Flare end of the hose to the brass coupling on the grill using a open wrench Do not apply pipe sealant 5 Connect the regulator to the L...

Page 10: ...e hinges 4 Hook the Sear Station onto the pins on the cabinet Insert the rear pin first then rotate the Sear Station to hook on the front pin 5 If the holes are not provided mark holes on the cabinet side using the Sear Station as a template Remove the sear station and drill two 1 4 holes 6 Reinstall the Sear Station and secure with the 1 4 20 stainless steel nuts and bolts provided 7 Hook up gas ...

Page 11: ...he burner knob to the off position leave the cover off and wait 5 minutes to repeat lighting procedure 8 CAUTION Do not leave the Infrared Sear Station unattended while cooking Manual Lighting Instructions If the electronic ignition does not light the burner the burner can be lit manually using a long match or taper 1 Remove the cover from the Infrared Sear Station 2 Ensure the Gas Supply Cylinder...

Page 12: ...liquid and fallen food particles Allow the pan and its contents to cool before cleaning Slide the pan out and wipe it clean Make sure the grease pan is fully inserted back into the Infrared Sear Station again It is highly recommended to clean the pan after every use to avoid any possibility of a grease fire Cooking Grates Leave the Cooking Grates in place for 5 10 minutes while the burner is on HI...

Page 13: ...break Also if the ceramic or the interior of the burner becomes wet while not in use later operation of the burner can create steam which may produce enough pressure to crack the ceramic In addition repeated soaking of the ceramic will cause it to swell and expand This expansion will create pressure on the ceramic and cause it to crack and crumble Never use water to control flare up while using th...

Reviews: