TWIN BUSCH GmbH
Technical changes for purposes of a technical advancement as well as deviation in colour, errors and printing mistakes are reserved.
page 12 of 45
Step12: Install the lifting arms.
Connect the lifting arm and the carriage with the pins. Install the swing arms on the carriages and make sure the
safety lock and half moon are correctly positioned.
Filling with Hydraulic oil
The oil tank has a volume of 10 Liters and should be filled to at least 80% to ensure the pump has enough oil.
(Recommended oil HLP 32).
Step 14:
Testing
1. When testing the lift for the first time
NEVER
do the test with a vehicle on the lift.
2. Check all the connections.
Step 15:
Mount the post covers and the door protections.(
Optional
)
Chain protection
Door protection
Oil hose protectoion plate
Half moon lock
Safety pin