TWIN BUSCH GmbH
Technical changes for purposes of a technical advancement as well as deviation in colour, errors and printing mistakes are reserved.
page 14 of 45
Start
Turn on the power switch
Press UP button
Motor drives the gear pump work
Cylinder piston drives the chain work
Chain drives the carriage rise
The lift is raised
Start
Turn on the power switch
Press the DOWN button
The lift is lowered
4.3 Flow chart for operation
4.4 Operating instructions
Raising the lift
1. Always read the instruction and safety manuals before working with the lift.
2. Drive the vehicle onto the centre of the lift making sure the weight is evenly displaced.
3.
Make sure that the vehicle can’t roll or move from the desired position.
4. Turn on the main switch and press the UP button (STOP and check once again that lifting pads are securely positioned)
then raise until the lift has reached the desired height.
5. When the lift has reached the required level press the safety lock button to engage the mechanical safety mechanism.
6. When all safety precautions have been taken, turn off the main switch and check the stability before working on the
Lowering the lift
1. Turn on the power.
2. Press the DOWN (I) button. The lift will automatically rise to disengage the safety mechanism before going down.
The lift will stop at approximately 800mm from the floor.
3. Press the DOWN (II) button to lower the lift, an alarm signal will be heard as the lift descends to the floor.
4. Remove the vehicle.
Raising
Lowering