8
Fig. 8
Fig. 9
STEP 9
: (check again )
1.
Raise the platform a little by pushing the up button on the power unit.
2.
Check the location of all the columns again. Make sure everything is OK.
3.
Again using the base plate of the column as guide, drill all the holes for anchoring.
4.
Anchor all the columns using bolts supplied. Make plumb by placing shims as close as
possible to the anchor bolts. This will prevent bending the column base plates.
5.
Check that all the cables are in sheave grooves.
6.
Check the leveling of the platforms. Adjust the length of the cables by the nuts on cables end
to level the platforms.
7.
Lower the platforms by simultaneously pressing the air-release valve and the release lever
on the power unit.
8.
If the platforms not level, adjust the height of the safety rack by the nut on the top of the
column. Do not forget to tighten the bolt on the lower end of the rack.
9.
Put on all the accessories such as front stop, ramp, cover etc.
STEP 10
: (start up)
1. Do not place any vehicle on the lift at this time!
2. Cycle the lift up and down several times to insure lock latches click together and all air is
removed from the system.
3. To lower the lift, the air- releases valve must be manually pressed while the lowering handle
of the pump is pressed. Latches will automatically reset once the lift ascends approximately
17”
"
from base.
Summary of Contents for FP14KO-A
Page 2: ...FP14KO A 14 000 lb Capacity Open Front Alignment Lift ASSEMBLY OPERATION MANUAL...
Page 3: ......
Page 7: ...3 Note All d Fig 1 imensions typical...
Page 17: ...PARTS DRAWING 2 III 38 2234 12 6 16 52 93 94 95 96 97 97 102 103 13...
Page 22: ...PARTS DRAWING 7 93 94 95 96 98 99 100 101 18...
Page 26: ......