background image

 
MOL

®

LIK module - Operating and Maintenance Manual 

Version: 10/2016 

 

 
MOL Katalysatortechnik GmbH, 06217 Merseburg, Germany 

 

 

3/ 22 

 

Table of contents 

 

Chapter  

Contents 

Page 

1

 

GENERAL 

5

 

1.1

 

Structure of the documentation 

5

 

1.2

 

Information on the formal layout of this manual 

5

 

1.3

 

Warranty 

5

 

2

 

GENERAL SAFETY INSTRUCTIONS 

6

 

2.1

 

Duty of the operator to exercise due care 

6

 

2.2 Safety information and symbols used 

7

 

2.3 Safety measures during normal operation 

7

 

2.4 Maintenance, repair and cleaning work 

8

 

2.5 Dangers arising if the safety instructions are not observed 

8

 

3

 

PRODUCT DESCRIPTION 

9

 

3.1

 

Designated use 

9

 

3.2

 

Technical data 

9

 

4

 

TRANSPORT 

11

 

4.1

 

Transport 

11

 

4.2

 

Content of the shipment 

11

 

4.3

 

Storage 

11

 

5

 

INSTALLATION 

12

 

6

 

COMMISSIONING 

13

 

6.1

 

Checks prior to commissioning: 

13

 

6.2

 

Basic settings 

13

 

6.3

 

Shutting-down of the system in normal situation 

14

 

6.4

 

Restart after maintenance or repair 

14

 

7

 

OPERATION 

15

 

7.1

 

Required operating conditions 

15

 

7.2

 

Operating the system 

15

 

7.3

 

Faults 

15

 

8

 

MAINTENANCE 

16

 

8.1

 

Maintenance and cleaning intervals 

16

 

8.2

 

Maintenance and inspection 

16

 

8.3

 

Maintenance and inspection intervals 

17

 

9

 

SPARE PARTS 

18

 

Summary of Contents for MOLLIK-M 100

Page 1: ...echnik GmbH 06217 Merseburg Germany 1 22 Operating and Maintenance Manual MOL LIK module Type MOLLIK M __ __ Read and keep this operating and maintenance manual carefully Warranty and guarantee claims...

Page 2: ...ents of this operating and maintenance manual are protected by copyright The use of this operating and maintenance manual or its individual contents is only allowed in relation to their intended purpo...

Page 3: ...nd cleaning work 8 2 5 Dangers arising if the safety instructions are not observed 8 3 PRODUCT DESCRIPTION 9 3 1 Designated use 9 3 2 Technical data 9 4 TRANSPORT 11 4 1 Transport 11 4 2 Content of th...

Page 4: ...MOL LIK module Operating and Maintenance Manual Version 10 2016 MOL Katalysatortechnik GmbH 06217 Merseburg Germany 4 22 10 STANDARDS AND REGULATIONS 19 11 APPENDIX 20...

Page 5: ...rectly to MOL Katalysatortechnik GmbH 1 2 Information on the formal layout of this manual Listing and action steps are marked by a References are indicated by Highlighting is used to draw particular a...

Page 6: ...module is used as intended The MOL LIK module is only operated in a faultless functional condition and in particular that the safety installations are regularly checked for their functionality The req...

Page 7: ...r to life and danger of injury This symbol indicates that particular danger to device material and environment is likely This symbol indicates information It does not identify any safety in structions...

Page 8: ...s removed e g the lighting unit are re installed and correctly positioned Check that any screw connections are tightened properly After completing any maintenance or repair work and before resuming pr...

Page 9: ...atalysatortechnik GmbH this interdiction may be waived Exceptions may vary from country to country We recommend installation by a specialist company Any other use or any use beyond what is specified i...

Page 10: ...e Diameter x length mm Weight kg MOLLIK M 75 xxxx 180 x 350 2 0 2 0 MOLLIK M 100L xxxx 180 x 560 2 7 2 7 MOLLIK M 150L xxxx 180 x 560 3 1 3 1 MOLLIK M 100 xxxx 250 x 350 3 6 3 6 MOLLIK M 150 xxxx 250...

Page 11: ...ipment should be checked for completeness and transport damage immediately on arri val Transport damage must be reported to the supplier immediately Do not drop the MOL LIK module and the control unit...

Page 12: ...ble for use in non pressurized vessels Appropriately certified catalyst modules are available for use in pressure vessels The use of appropriate upstream filter technology has been proven to minimize...

Page 13: ...3 2 Technical data The following additional conditions must be met The MOL LIK module has been correctly and completely installed and commissioned The MOL LIK module is completely covered with water...

Page 14: ...n The system must be shut down for maintenance or repair work 6 4 Restart after maintenance or repair Before each initial start up the operating staff must make sure that a safe start up is possible a...

Page 15: ...e operating instructions and maintenance manual from MOL Katalysatortechnik as well as the documentation of the component suppliers The system must be regularly checked and maintained Point 8 Maintena...

Page 16: ...blies are touched or removed 8 1 Maintenance and cleaning intervals We recommend to sign a maintenance contract with MOL Katalysatortechnik GmbH and have the system checked annually by the customer se...

Page 17: ...water for de tached deposits Weekly Detached deposits must be removed from the circulating water If necessary partially replace the water Check of the MOL LIK module for pos sible deposits Weekly Such...

Page 18: ...2016 MOL Katalysatortechnik GmbH 06217 Merseburg Germany 18 22 9 Spare parts Order spare parts and operating equipment directly from MOL Katalysatortechnik MOL Katalysatortechnik GmbH Leunastra e 6 06...

Page 19: ...specific standards can differ in detail Compliance with applicable country specific standards is up to the user Table Standards DIN 19643 Wasseraufbereitung von Schwimmbeckenwasser DIN EN 292 Teil 1 2...

Page 20: ...MOL LIK module Operating and Maintenance Manual Version 10 2016 MOL Katalysatortechnik GmbH 06217 Merseburg Germany 20 22 11 Appendix...

Page 21: ...MOL LIK module Operating and Maintenance Manual Version 10 2016 MOL Katalysatortechnik GmbH 06217 Merseburg Germany 21 22...

Page 22: ...MOL LIK module Operating and Maintenance Manual Version 10 2016 MOL Katalysatortechnik GmbH 06217 Merseburg Germany 22 22...

Reviews: