background image

 
MOL

®

LIK module - Operating and Maintenance Manual 

Version: 10/2016 

 

 
MOL Katalysatortechnik GmbH, 06217 Merseburg, Germany 

 

 

7/ 22 

 

2.2 Safety information and symbols used 

 

Practical safety instructions are given in this operating and maintenance manual to indicate possi-
ble risks when operating the MOL

®

LIK-module.  

 

These residual risks include hazards to 

  People 

  MOL

®

LIK-module  

  The environment 

 

The following symbols are primarily intended to draw attention to the safety instructions! 

 

 

 

This symbol indicates that particular danger to personnel is likely. 

(Danger to life and danger of injury) 

 

 

 

This symbol indicates that particular danger  to device, material and 
environment is likely. 

 

 

This symbol indicates information. It does not identify any safety in-
structions. 

 

 
2.3 Safety measures during normal operation  

 

 

The device may only be operated by trained and authorized persons. 

Before commissioning the device, check for signs of visible damage and make sure that it will only 
be operated in a faultless condition! Immediately report any deficiencies found to the person re-
sponsible! 

Before commissioning the device, remove any material or items from the working area of the device 
that are not required for operation! 

Before  commissioning  the  device,  check  and  make  sure  that  all  safety  devices  are  working 
properly! 

 

Summary of Contents for MOLLIK-M 100

Page 1: ...echnik GmbH 06217 Merseburg Germany 1 22 Operating and Maintenance Manual MOL LIK module Type MOLLIK M __ __ Read and keep this operating and maintenance manual carefully Warranty and guarantee claims...

Page 2: ...ents of this operating and maintenance manual are protected by copyright The use of this operating and maintenance manual or its individual contents is only allowed in relation to their intended purpo...

Page 3: ...nd cleaning work 8 2 5 Dangers arising if the safety instructions are not observed 8 3 PRODUCT DESCRIPTION 9 3 1 Designated use 9 3 2 Technical data 9 4 TRANSPORT 11 4 1 Transport 11 4 2 Content of th...

Page 4: ...MOL LIK module Operating and Maintenance Manual Version 10 2016 MOL Katalysatortechnik GmbH 06217 Merseburg Germany 4 22 10 STANDARDS AND REGULATIONS 19 11 APPENDIX 20...

Page 5: ...rectly to MOL Katalysatortechnik GmbH 1 2 Information on the formal layout of this manual Listing and action steps are marked by a References are indicated by Highlighting is used to draw particular a...

Page 6: ...module is used as intended The MOL LIK module is only operated in a faultless functional condition and in particular that the safety installations are regularly checked for their functionality The req...

Page 7: ...r to life and danger of injury This symbol indicates that particular danger to device material and environment is likely This symbol indicates information It does not identify any safety in structions...

Page 8: ...s removed e g the lighting unit are re installed and correctly positioned Check that any screw connections are tightened properly After completing any maintenance or repair work and before resuming pr...

Page 9: ...atalysatortechnik GmbH this interdiction may be waived Exceptions may vary from country to country We recommend installation by a specialist company Any other use or any use beyond what is specified i...

Page 10: ...e Diameter x length mm Weight kg MOLLIK M 75 xxxx 180 x 350 2 0 2 0 MOLLIK M 100L xxxx 180 x 560 2 7 2 7 MOLLIK M 150L xxxx 180 x 560 3 1 3 1 MOLLIK M 100 xxxx 250 x 350 3 6 3 6 MOLLIK M 150 xxxx 250...

Page 11: ...ipment should be checked for completeness and transport damage immediately on arri val Transport damage must be reported to the supplier immediately Do not drop the MOL LIK module and the control unit...

Page 12: ...ble for use in non pressurized vessels Appropriately certified catalyst modules are available for use in pressure vessels The use of appropriate upstream filter technology has been proven to minimize...

Page 13: ...3 2 Technical data The following additional conditions must be met The MOL LIK module has been correctly and completely installed and commissioned The MOL LIK module is completely covered with water...

Page 14: ...n The system must be shut down for maintenance or repair work 6 4 Restart after maintenance or repair Before each initial start up the operating staff must make sure that a safe start up is possible a...

Page 15: ...e operating instructions and maintenance manual from MOL Katalysatortechnik as well as the documentation of the component suppliers The system must be regularly checked and maintained Point 8 Maintena...

Page 16: ...blies are touched or removed 8 1 Maintenance and cleaning intervals We recommend to sign a maintenance contract with MOL Katalysatortechnik GmbH and have the system checked annually by the customer se...

Page 17: ...water for de tached deposits Weekly Detached deposits must be removed from the circulating water If necessary partially replace the water Check of the MOL LIK module for pos sible deposits Weekly Such...

Page 18: ...2016 MOL Katalysatortechnik GmbH 06217 Merseburg Germany 18 22 9 Spare parts Order spare parts and operating equipment directly from MOL Katalysatortechnik MOL Katalysatortechnik GmbH Leunastra e 6 06...

Page 19: ...specific standards can differ in detail Compliance with applicable country specific standards is up to the user Table Standards DIN 19643 Wasseraufbereitung von Schwimmbeckenwasser DIN EN 292 Teil 1 2...

Page 20: ...MOL LIK module Operating and Maintenance Manual Version 10 2016 MOL Katalysatortechnik GmbH 06217 Merseburg Germany 20 22 11 Appendix...

Page 21: ...MOL LIK module Operating and Maintenance Manual Version 10 2016 MOL Katalysatortechnik GmbH 06217 Merseburg Germany 21 22...

Page 22: ...MOL LIK module Operating and Maintenance Manual Version 10 2016 MOL Katalysatortechnik GmbH 06217 Merseburg Germany 22 22...

Reviews: