TUTA S30 GSM POWER SOCKET USER MANUAL
Successful SMS reply
Schedule control: function ON
WorkDay, StartTime-EndTime
If the value of the “
WorkDay, StartTime, EndTime”
on the SMS
reply are all 0, it means the time duration has not been set.
(Refer to 3.4.2)
Then TUTA S30 will keep switching on or off the output
automatically according to the schedule settings.
3.5.2 Set time period to switch on the output
Description
After successful setting of time duration to switch on the socket
output, the schedule parameter will be saved on the socket until
TUTA S30 is reset to factory settings.
But the “timed switch on the output” feature is applied only when
command 17 be set.
Method
The
Master
user sends following SMS message in order to:
Set time period to switch on the output:
#129#
WorkDay
#
StartTime
#
EndTime
#
(19)
37
Summary of Contents for S30
Page 1: ...TUTA S30 GSM Power Socket ...
Page 2: ...TUTA S30 GSM POWER SOCKET USER MANUAL User Manual Manual version 1 2 2 ...
Page 14: ...TUTA S30 GSM POWER SOCKET USER MANUAL 1 2 Package contents GSM power socket 1 unit 14 ...
Page 15: ...TUTA S30 GSM POWER SOCKET USER MANUAL Temperature sensor 1 unit User manual 1 unit 15 ...
Page 16: ...TUTA S30 GSM POWER SOCKET USER MANUAL 1 3 Sockets instructions 16 ...
Page 17: ...TUTA S30 GSM POWER SOCKET USER MANUAL Figure 1 TUTA S30 instructions 17 ...
Page 65: ...TUTA S30 GSM POWER SOCKET USER MANUAL TUTA S30 GSM Power Socket 65 ...
Page 66: ...TUTA S30 GSM POWER SOCKET USER MANUAL E1046 66 ...