STEP 1�
Open Right Cover for Wiring: Connect L1, L2, L3 and N of AC power to 4P termi-
nal. Fasten each wire with proper screw and torque number- 120Kgf.cm/5-15
secs. Connect the PE wire (green with yellow) to grounding position of charger
and torque number- 60Kgf.cm.
L1
L2
L3
N
PE
Pull AC power cables to power distribution box, connect the Protective Earth
wire (Green/Yellow) to ground point of power distribution box. Neutral should
be shorted with ground point to meet TN(-S) grounding system. Ethernet cable
should be connected to charger RJ45 port (refer to pic. of section 4.1) and fixed
with adhesive cable ties as the picture below.