![TurnOnGreen FSP 600 User'S Manual & Installation Instructions Download Page 14](http://html1.mh-extra.com/html/turnongreen/fsp-600/fsp-600_users-manual-and-installation-instructions_1182203014.webp)
3�2�1 Service Wiring
•
Ground Connection
Always connect the Neutral at the service to Earth Ground. If ground is not provid-
ed by the electrical service then a grounding stake must be installed nearby. The
grounding stake must be connected to the ground bar in the main breaker panel
and Neutral connected to Ground at that point.
•
480Vac (Line to Line) Three-Phase
CAUTION!
This is feed from Wye-connection power grid, the FSP 600 can connect
to L1, L2 or L3, and Neutral. Earth ground must be connected to neutral
at only one point, usually at the breaker panel.
480V Three-Phase Wiring Connection
WARNING!
Earth Connection is Essential!
PE
277V 277V
277V
480V
Neutral
L3
L1
L2
DANGERS
Be Aware of High Voltage!
11
Summary of Contents for FSP 600
Page 2: ......