STEP 1�
1. Build 1020mm x 430mm x 200mm (40.16” x 16.93” x 7.87”) concrete base on
the level to stand charger in advance.
2. Implant AC input cable conduit smaller than Φ80 mm (3.15”), eg. Φ2.5” PVC
conduit; and SFTP Ethernet cable conduit smaller than Φ34 mm (1.34”), eg.
Φ1” PVC conduit.
3. And implant 4 pcs of M12 screw stick out the concrete base for 40 mm (1.57”)
to fix the charger. The positioning of these 4 pcs of M12 screws should be
within ± 2 mm (0.08”) in short axis, ± 8 mm (0.32”) in long axis according to
screw holes of charger.
4. To fit this positioning requirement, a steel plate fixture be suggested. Please
create the fixture by the following drawing or order this fixture from your ven
-
dor.
5. The other way to fix the charger on concrete base is install 2 of L-brackets ac
-
cessories outside of charger and drill the screw holes (Φ12 mm (0.47”)) on the
cement base as drawing below.
3�6�2 Build Concrete Base
The distance
should be sufficient
for maintenance
from the wall.
screw sticks x 4
L Bracket
orifices x 4
L Bracket
orifices x 4
AC Cable Conduit
Ethernet Cable Conduit
Tilt sensor
20