
ORIGINAL
Page 34
Electric Components
(Electric components have been assembled prior to delivery to you; you only have to plug in
the plugs for the motors.)
Pos.
No.
Description
1
Control Linak for TurnAid T4
2
Cable-distribution box for open-bus cables for TurnAid T4
3
Junction box, type Linak MJB-UBL, open-bus cables
4
Hand control, type HB34, for TurnAid T4, standard
5
Gear motor for roll, incl. gear (2 pcs. mounted inside the rolls)
6
Cable for motor, type LA23, L=115 mm
7
Cable between control and distribution box for TurnAid T4
8
Cable between two distribution boxes for TurnAid T4, L=600 mm
9
Power cable for control box
10
Motor cable for motor in roll for TurnAid T4, L=1200 mm (Fitted to the
rolls)
11
TurnAid T4 bed rail with roll right side
(GREEN)
12
TurnAid T4 bed rail with roll left side
(RED)
13
Class II equipment
9.
Electric connection
Connect TurnAid T4 to the power supply, 100-240 V, 50/60 Hz AC. Electrical connection
preferably is made through grounded socket outlet.
Marking of control box:
If you detect damage to the electric parts, pull out the plug and call a service technician.
10.
Disassembly of TurnAid T4 and transport
instructions
In case you want to dismount TurnAid T4 from the bed, follow below instructions.
•
Pull out the main cable from the socket plug.
•
Pull the 2 cables from the motor rolls out of the control box, plug no. 1 and 3.