background image

 

 

 

 

 

3. Legends and Descriptions 

 

 

 

 

 

 

 

 

 

 

Input-table  (10)  holds  down  the  sheet  at  the  machine  input  slot.  After  aligning 
the front edge of the sheet just push it towards input coating roller (11 and 11a). 
These coating rollers will drive the sheet to the  cylinder. Coating roller (11a) is 
driven and coating roller (11) loosely rotates around it. 

Coating  roller  (12)  loads  and  coats  the  sheet.  The  glue  film  is  set  through  the 
distance  between  coating  roller  (12)  and  coating  scraper  (12a).  The  coating 
scraper grabs (transferring) the adhesive from the tray to the coating roller (12). 
To increase or thin out coating thickness, rotate knob (13) which will, in turn, lift 
or lower the coating scraper (12). Knob (13a) fastens adjustments by the height 
variation between coating rollers (12 and 12a). The adjusting shaft (14) is found 
between  coating  rollers  (12)  and  input  coating  rollers  (11  and  11a),  which  will 
drive the sheet through the coating roller (12) making sure the sheet is entirely 
glued. 

The stripper fingers (15) are loose, facing the coating roller (12). Their purpose 
is to separate the sheet from the coating roller (12). 

 

 

 

 

15 

12  14 

10 

11a 

11 

12a 

18 

18a 

13a 

13  

Summary of Contents for Liliput 500

Page 1: ...1 Liliput 500 Glue machine...

Page 2: ...cable Regulations for Accident Prevention and Environmental Protection They must always be at hand on site when the machine is being used This guide must be read and observed by all operators dealing...

Page 3: ...ductivity 7 3 Legends and Descriptions 8 4 Assembly and Operation 10 5 Operating the machine 11 6 Maintenance 12 7 Troubleshooting 13 8 Cardboard Attachment 14 9 Glue coating on edges and in strips 15...

Page 4: ...lfunction that may affect safety is immediately solved This machine is exclusively designed for glue coating Any other use is not deemed appropriate and the manufacturer is not liable for damages or a...

Page 5: ...d instructor with clearly defined qualification for operation assembly maintenance and repair of the machine Make sure only authorized personnel have permission to operate the machine Electrical maint...

Page 6: ...achine operation production assembly or setup including its safety features such as inspection and maintenance Consequently downtime and operation activities described in this guide must always be obs...

Page 7: ...of water based cold and hot glue or latex are possible The amount of glued sheets directly depends on its size length on the speed setup in the machine and on the speed operators are handling the equi...

Page 8: ...12a The coating scraper grabs transferring the adhesive from the tray to the coating roller 12 To increase or thin out coating thickness rotate knob 13 which will in turn lift or lower the coating scr...

Page 9: ...12a you will find shields 16 and 16a with seals Shields to prevent an accumulation of adhesive on rolls that might damage coating rollers ______________________________________________________________...

Page 10: ...perly and are noise free When motor is purchased as an optional component make sure the network supports the motor data recorded during its setup or assembly Local conditions must be considered in det...

Page 11: ...esive in the first rotations first starting minutes and not interfering with coating rollers proper rotation Note Tray 18a must be filled with water 2 3 times a day Make sure the water does not evapor...

Page 12: ...lete cleaning procedures 6 1 Cleaning procedures After working process is complete a full cleaning procedure is required as described below While motor is in operation at low speed dislodge the trays...

Page 13: ...emove all stripper fingers from the shaft and adjust their height If they are slightly worn loosen and rotate them a bit or replace the blades 7 3 Motor is not rotating or is running slowly Ensure the...

Page 14: ...attachment is purchased separately pulley 22 must be assembled on top of the shaft by the user Pulley and attachment as well as belt must be delivered all at the same time 8 2 Knob 25 controls pressur...

Page 15: ...ssembly of shaft 33 on top of which connecting rods 34 are mounted Connecting rods and its rollers must be assembled only on supporting rings 31b to increase sheet pressure against gluing rings and en...

Page 16: ...ng Pump The dosing pump assures controlled water supply to the animal glue tray Due to machine s layout the glue in the animal glue tray is constantly moving and getting in contact with heat and dry a...

Page 17: ...ted in order to approve viscosity c Start working normally coating nonstop d Unmelted glue must start constantly being added while the machine is running Since there are different types of adhesives d...

Reviews: