FIG. 5
Maneuver the two
Guide Rods (#3)
into the holes on the
bottom side of the
Guide Rod Retainer (#4)
.
FIG. 6
Caution:
it is strongly recommended to use another
person in assisting with this assembly.
Attach the
Front Frame (#29)
to the
Base Frame (#28)
using two
Hex Head Cap Screws 3/8-16 X 4 1/4 (#54), four Flat Washers SAE
3/8” (#17), and two Nylon Insert Lock Nuts 3/8-16 (#55).
FIG. 7
Attach the
Front Frame (#29)
to the
Guide Rod Retainer
(#4)
and the
Weight Stack Frame (#1)
using two Hex Head Cap
Screws 1/2-13 X 3 3/4 (#60), four Flat Washers SAE 1/2” (#27), and
two Nylon Insert Lock Nuts 1/2-13 (#20).
3
3
29
28
4
29
FIG. 8
Attach the
Pec Dec Arms (#30, #31)
and the Aluminum
Cam Plates (#34) to the
Front Frame (#29)
.
SP-405 Pectoral Contractor
4
3
1
31
34
30
34
29