TL1700SR
-
Section 3: Initial Setup 3-1
Section 3: Initial Setup
•
Remove all parts banded and wired to main frame and set aside. (
Fig.2.1.
)
•
Remove monitor, wiring harness and manuals from shipping location behind end shield.
•
Mount film tensioner arm to swing arm. See parts illustration for proper positioning (
pg.5-14
).
•
Mount tensioner to tensioner arm with clamps. See parts illustration (
pg.5-14
)
•
Before transporting, check tire pressure, raise legs and jack stand.
•
Connect hoses to power unit if planning to a dry run.
•
Remove wrapper wiring harness from frame (shown in previous image).
Fig.2.1
Summary of Contents for TL1700SR
Page 5: ...V Operator s Manual TL1700SR...
Page 11: ...2 3 Section 2 Safety TL1700SR Safety Decal Location...
Page 17: ...Intentionally Left Blank...
Page 35: ...7 2 Section 7 Bale Wrap Computer Operation TL1700SR...
Page 36: ...TL1700SR Section 7 Bale Wrap Computer Operation 7 3...
Page 37: ...7 4 Section 7 Bale Wrap Computer Operation TL1700SR...
Page 38: ...TL1700SR Section 7 Bale Wrap Computer Operation 7 5...
Page 39: ...7 6 Section 7 Bale Wrap Computer Operation TL1700SR...
Page 40: ...TL1700SR Section 7 Bale Wrap Computer Operation 7 7...
Page 41: ...7 8 Section 7 Bale Wrap Computer Operation TL1700SR...
Page 42: ...TL1700SR Section 7 Bale Wrap Computer Operation 7 9...
Page 43: ...7 10 Section 7 Bale Wrap Computer Operation TL1700SR...
Page 51: ...IV Torque Values Imperial TL1700SR Torque Values Imperial...
Page 52: ...TL1700SR Torque Values Metric V Torque Values Metric...