background image

 

 

7 Battery maintenance 

8.1 Transportation 

Lithium batteries are dangerous goods. Passed the test of UN38.3, this product meets 

the transportation requirements for dangerous goods for lithium batteries. After the 

installation of the battery on site, the original packaging (contains the lithium battery 

identification) should be kept. When the battery needs to be returned to the factory for 

repair, please pack the battery with the original packaging to reduce unnecessary trouble. 

8.2 Storage 

After purchasing the battery, please store it with following instructions: 

1)  Please store it in a dry and ventilated environment, keep it away from heat 

sources; 

2)  Please keep it in an environment with storage temperature as -20 ° C ~ 50 ° C, 

humidity <85% RH; 

3)  For long-term storage (>3 months), please put it in an environment with a 

temperature of 18 ° C to 28 ° C and a humidity of < 85% RH; 

4)  The battery should be stored in accordance with the storage requirements 

mentioned above, and the battery should be installed within 6 months since 

delivered from the factory and used with compatible inverters; 

 

The battery cannot be disposed of as household refuse. When the service life of the 

battery reaches to the limit, it is not required to return it to the dealer or TSUNESS, but it 

must be recycled to the special waste lithium battery recycling station in the area. 

 

 

 

 

Note

 

The battery remains 60% power when it is sent from the factory. 

The longer the battery is stored, the DOD value is getting bigger. When 

the battery remaining voltage fails to reach the startup voltage 

requirement, the battery may be damaged. 

Judgment condition: Close the battery breaker switch and press the 

BMS switch. At this time, if the LED light is flashing, it is running 

normal. If the LED light is off, the battery is in faulty. 

Summary of Contents for TSOL-B100E-S

Page 1: ...31 TSOL B100E S...

Page 2: ...ion 4 3 2 Product Model Description 4 3 3 Datasheet 5 4 Installation Instructions 5 4 1 Items in the package 5 4 2 Installation Position 6 4 3 Mounting Procedure 7 5 Electrical Connections 11 5 1 Elec...

Page 3: ...The tasks described in this manual only can be performed by qualified personnel 1 3 Symbols Used The following types of safety instructions and general information appear in this document as describe...

Page 4: ...ds on battery can install maintain retrieve and process this product TSUNESS shall not be liable for any loss or warranty claims arising from any unauthorized change of product which may cause fatal i...

Page 5: ...urred Read the usage manual to troubleshoot problems This device SHALL NOT be disposed of in residential waste Please go to Chapter Seven Battery maintenance for proper treatment Recyclable 2 3 Emerge...

Page 6: ...arge or over discharge The battery employs modular design for easy installation and wiring and can be used by up to 3 parallel devices Battery is also called slave machine in the following text 3 2 Pr...

Page 7: ...al Parameters Battery Type Lithium ion Communication CAN Operating Temperature Range 0 C 45 C Cooling Method Natural Convection Ambient Humidity 0 95 Non condensing Ingress Protection IP65 Dimensions...

Page 8: ...tion and suggests an indoor installation or an installation under a sheltered place to prevent the battery from exposure to direct sun rain and snow erosion Vertical ground mounting method is recommen...

Page 9: ...r air circulation will affect the performance of internal electronic components and shorten the service life of inverter 4 3 Mounting Procedure The battery uses free standing installation and its posi...

Page 10: ...on of bracket s holes on the wall and drill the holes Then use a rubber hammer to drive screws into the holes TSOL ACU3 0K is a master machine while TSOL B100E S is a slave machine To ensure the insta...

Page 11: ...Fix the brackets in the marked position with hex screws...

Page 12: ...machine and the salve machines Carefully mount the device onto the brackets and make sure the bottom of the device is attached to the brackets One master machine can be matched with up to three more...

Page 13: ...ect Description A BMS switch B Battery switch C c BAT port D d BMS LINK port E e BAT port 5 2 Slave connection Make sure that the circuit breaker is off remove the right wiring cover screw and pull ou...

Page 14: ...hen there is a hole plug as shown in the figure below Then pass the original cable through the waterproof jacket Only 3 cables are required BAT BAT BAT BAT LINK LINK to connect a slave Be careful when...

Page 15: ...cket and then crimp the RJ45 plug Object Description 1 blank 2 blank 3 blank 4 blank 5 blank 6 blank 7 RS485A 8 RS485B Note Please use the original matching battery cable Do not connect one battery to...

Page 16: ...to lock the cover plate Torque is recommended 14kgf cm 6 Debugging Instructions 6 1 System commissioning After the wiring is completed please refer to the ACU series manual for system operation Note T...

Page 17: ...in an environment with a temperature of 18 C to 28 C and a humidity of 85 RH 4 The battery should be stored in accordance with the storage requirements mentioned above and the battery should be instal...

Page 18: ......

Reviews: